and supplement dated October 23, 1996. The amendments lower the maximum allowable reactor building pressure, lower the actuation setpoint for actuation of the reactor building spray system, and modify the associated TS Bases requirements. A copy of the related Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commission's biweekly Federal Register notice. Sincerely
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
The amendments revise the TSs to include implementation of relaxed axial offset control of the react...
response to your application dated June 20, 1995, as supplemented August 30, 1995. This amendment al...
The amendments consist of changes to the Technical Specifications (TS) in response to your applicati...
These amendments approve: (1) implementation of the revised thermal design procedure (RTDP), (2) re...
Nuclear Station. These amendments consist of changes to the Technical Specifications in response to ...
June 25, 2001, to increase the licensed thermal power level and to change the Technical Specificatio...
DPR-55 for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the...
for the Oconee Nuclear Station, Units 1, 2 and 3. These amendments consist of changes to the Station...
Operating License No. DPR-37 for the Surry Power Station, Unit Nos. 1 and 2, respectively. The amend...
Station. The amendment consists of changes to the Technical Speci fications in response to your appl...
The amendment revises the Appendix A Technical Specifications (TSs) relating to Reactor Coolant Syst...
amendment consists of changes to the Technical Specifications (TSs) in response to your application ...
Unit 1 and Unit 2 Technical Specifications (TS) for the Edwin I. Hatch Nuclear Plant. The amendment ...
the Oconee Nuclear Station, Units 1, 2, and 3. These amendments are in response to your application ...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
The amendments revise the TSs to include implementation of relaxed axial offset control of the react...
response to your application dated June 20, 1995, as supplemented August 30, 1995. This amendment al...
The amendments consist of changes to the Technical Specifications (TS) in response to your applicati...
These amendments approve: (1) implementation of the revised thermal design procedure (RTDP), (2) re...
Nuclear Station. These amendments consist of changes to the Technical Specifications in response to ...
June 25, 2001, to increase the licensed thermal power level and to change the Technical Specificatio...
DPR-55 for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the...
for the Oconee Nuclear Station, Units 1, 2 and 3. These amendments consist of changes to the Station...
Operating License No. DPR-37 for the Surry Power Station, Unit Nos. 1 and 2, respectively. The amend...
Station. The amendment consists of changes to the Technical Speci fications in response to your appl...
The amendment revises the Appendix A Technical Specifications (TSs) relating to Reactor Coolant Syst...
amendment consists of changes to the Technical Specifications (TSs) in response to your application ...
Unit 1 and Unit 2 Technical Specifications (TS) for the Edwin I. Hatch Nuclear Plant. The amendment ...
the Oconee Nuclear Station, Units 1, 2, and 3. These amendments are in response to your application ...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
The amendments revise the TSs to include implementation of relaxed axial offset control of the react...
response to your application dated June 20, 1995, as supplemented August 30, 1995. This amendment al...