amendment consists of changes to the Technical Specifications (TSs) in response to your application dated August 19, 1997, as supplemented by letter dated August 20, 1997. This amendment increases the allowable band for the control and shutdown rod demanded position versus indicated position from ± 12 steps to ± 18 steps when the power level is not greater than 85 % rated thermal power. A copy of our safety evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice. Sincerely, /s
for the Oconee Nuclear Station, Units 1, 2 and 3. These amendments consist of changes to the Station...
the Oconee Nuclear Station, Units 1, 2, and 3. The amendments consist of changes to the Technical Sp...
for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the Techni...
Unit Nos. 1 and 2. These amendments consist of changes to the Technical Specifications (TSs) in resp...
June 25, 2001, to increase the licensed thermal power level and to change the Technical Specificatio...
response to your application dated June 20, 1995, as supplemented August 30, 1995. This amendment al...
The amendment revises the Appendix A Technical Specifications (TSs) relating to Reactor Coolant Syst...
The amendment modifies Technical Specifications (TSs) to relocate the boration subsystem and Residua...
These amendments approve: (1) implementation of the revised thermal design procedure (RTDP), (2) re...
the Oconee Nuclear Station, Units Nos. 1, 2 and 3. These amendments consist of changes to the Statio...
the Oconee Nuclear Station, Units Nos. 1, 2 and 3. These amendments consist of changes to the Statio...
Nuclear Station, Units Nos. 1, 2 and 3. These amendments consist of changes to the Station's co...
for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the Statio...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
The amendment would increase the engineered safety features (ESF) response time for Low Steamline Pr...
for the Oconee Nuclear Station, Units 1, 2 and 3. These amendments consist of changes to the Station...
the Oconee Nuclear Station, Units 1, 2, and 3. The amendments consist of changes to the Technical Sp...
for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the Techni...
Unit Nos. 1 and 2. These amendments consist of changes to the Technical Specifications (TSs) in resp...
June 25, 2001, to increase the licensed thermal power level and to change the Technical Specificatio...
response to your application dated June 20, 1995, as supplemented August 30, 1995. This amendment al...
The amendment revises the Appendix A Technical Specifications (TSs) relating to Reactor Coolant Syst...
The amendment modifies Technical Specifications (TSs) to relocate the boration subsystem and Residua...
These amendments approve: (1) implementation of the revised thermal design procedure (RTDP), (2) re...
the Oconee Nuclear Station, Units Nos. 1, 2 and 3. These amendments consist of changes to the Statio...
the Oconee Nuclear Station, Units Nos. 1, 2 and 3. These amendments consist of changes to the Statio...
Nuclear Station, Units Nos. 1, 2 and 3. These amendments consist of changes to the Station's co...
for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the Statio...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
The amendment would increase the engineered safety features (ESF) response time for Low Steamline Pr...
for the Oconee Nuclear Station, Units 1, 2 and 3. These amendments consist of changes to the Station...
the Oconee Nuclear Station, Units 1, 2, and 3. The amendments consist of changes to the Technical Sp...
for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the Techni...