The amendment revises the Appendix A Technical Specifications (TSs) relating to Reactor Coolant System heatup and cooldown limitations. Specifically, Figures 3.4-2 and 3.4-3 are modified to show applicability of the curves up to 11.1 equavalent full-power years (EFPY), to provide revised RTNDT values at 11.1 EFPY at 1/4 and 3/4 thickness, and to indicate the copper content of the controlling material. These changes implement commitments made by North Atlantic Energy Corporation (letter G. Thomas to USNRC dated November 30, 1988) in response to Generic Letter 88-11. Bases Section 3/4 4.9 is revised to reflect the methodology applied to determine the P/T limits. A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance ...
for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the Statio...
changes to the Technical Specifications (TSs) in response to your request dated September 25, 1989, ...
The amendments consist of changes to the Technical Specifications (TS) in response to your applicati...
The amendment modifies Technical Specifications (TSs) to relocate the boration subsystem and Residua...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
These amendments approve: (1) implementation of the revised thermal design procedure (RTDP), (2) re...
Station. The amendment consists of changes to the Technical Specifications (Appendix B) in response ...
Operating License No. DPR-37 for the Surry Power Station, Unit Nos. 1 and 2, respectively. The amend...
Station. The amendment consists of changes to the Technical Speci fications in response to your appl...
The amendments revise the TSs to include implementation of relaxed axial offset control of the react...
a change to the Millstone Unit No. 3 Technical Specifications. The proposed changes were primarily a...
DPR-55 for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the...
amendment consists of changes to the Technical Specifications (TSs) in response to your application ...
an amendment to the above license in the form of changes to the technical specifications. The propos...
amendment consists of changes to the Technical Specifications (TSs) in response to your application ...
for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the Statio...
changes to the Technical Specifications (TSs) in response to your request dated September 25, 1989, ...
The amendments consist of changes to the Technical Specifications (TS) in response to your applicati...
The amendment modifies Technical Specifications (TSs) to relocate the boration subsystem and Residua...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
These amendments approve: (1) implementation of the revised thermal design procedure (RTDP), (2) re...
Station. The amendment consists of changes to the Technical Specifications (Appendix B) in response ...
Operating License No. DPR-37 for the Surry Power Station, Unit Nos. 1 and 2, respectively. The amend...
Station. The amendment consists of changes to the Technical Speci fications in response to your appl...
The amendments revise the TSs to include implementation of relaxed axial offset control of the react...
a change to the Millstone Unit No. 3 Technical Specifications. The proposed changes were primarily a...
DPR-55 for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the...
amendment consists of changes to the Technical Specifications (TSs) in response to your application ...
an amendment to the above license in the form of changes to the technical specifications. The propos...
amendment consists of changes to the Technical Specifications (TSs) in response to your application ...
for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the Statio...
changes to the Technical Specifications (TSs) in response to your request dated September 25, 1989, ...
The amendments consist of changes to the Technical Specifications (TS) in response to your applicati...