The amendments consist of changes to the Technical Specifications (TS) in response to your application dated July 14, 1993, as supplemented August 24 and September 22, 1993. The amendments revise TS 3.1.2.9 to clarify the role of High Pressure Injection and Core Flood Tank deactivation in maintaining pilot operated relief valve operability for low temperature overpressure protection (LTOP), add restrictions regarding applicability of controls which assure 10 minutes are available for operator action to mitigate an LTOP event, revise the Pressure/Temperature limits and associated LTOP setpoints, and make associated administrative changes. Also, the Bases would be revised to be consistent with the above changes The conformance of the upper sh...
The amendments revise the TSs to include implementation of relaxed axial offset control of the react...
the Oconee Nuclear Station, Units Nos. 1, 2 and 3. These amendments consist of changes to the Statio...
changes to the Technical Specifications (TSs) in response to your request dated September 25, 1989, ...
response to your application dated June 20, 1995, as supplemented August 30, 1995. This amendment al...
Operating License No. DPR-37 for the Surry Power Station, Unit Nos. 1 and 2, respectively. The amend...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
an amendment to the above license in the form of changes to the technical specifications. The propos...
for the Oconee Nuclear Station, Units 1, 2 and 3. These amendments consist of changes to the Station...
consists of changes to the Technical Specifications (TSs) in response to your application dated July...
and supplement dated October 23, 1996. The amendments lower the maximum allowable reactor building p...
DPR-55 for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the...
Unit 1 and Unit 2 Technical Specifications (TS) for the Edwin I. Hatch Nuclear Plant. The amendment ...
In accordance with 10 CFR 50.90, "Application for amendment of license or construction permit, ...
the Oconee Nuclear Station, Units 1, 2, and 3. These amendments are in response to your application ...
These amendments approve: (1) implementation of the revised thermal design procedure (RTDP), (2) re...
The amendments revise the TSs to include implementation of relaxed axial offset control of the react...
the Oconee Nuclear Station, Units Nos. 1, 2 and 3. These amendments consist of changes to the Statio...
changes to the Technical Specifications (TSs) in response to your request dated September 25, 1989, ...
response to your application dated June 20, 1995, as supplemented August 30, 1995. This amendment al...
Operating License No. DPR-37 for the Surry Power Station, Unit Nos. 1 and 2, respectively. The amend...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
an amendment to the above license in the form of changes to the technical specifications. The propos...
for the Oconee Nuclear Station, Units 1, 2 and 3. These amendments consist of changes to the Station...
consists of changes to the Technical Specifications (TSs) in response to your application dated July...
and supplement dated October 23, 1996. The amendments lower the maximum allowable reactor building p...
DPR-55 for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the...
Unit 1 and Unit 2 Technical Specifications (TS) for the Edwin I. Hatch Nuclear Plant. The amendment ...
In accordance with 10 CFR 50.90, "Application for amendment of license or construction permit, ...
the Oconee Nuclear Station, Units 1, 2, and 3. These amendments are in response to your application ...
These amendments approve: (1) implementation of the revised thermal design procedure (RTDP), (2) re...
The amendments revise the TSs to include implementation of relaxed axial offset control of the react...
the Oconee Nuclear Station, Units Nos. 1, 2 and 3. These amendments consist of changes to the Statio...
changes to the Technical Specifications (TSs) in response to your request dated September 25, 1989, ...