These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts thermal (MWt) to 3,489 MWt. The changes are anticipated to increase each units net electrical output by approximately 14 MWe. The request is based on the installation of the Caldon LEFM ultrasonic flow measurement system with its ability to achieve increased accuracy in measuring reactor feedwater flow. In approving the enclosed amendments, the NRC staff has relied on the commitments included in your May 22, 2001, supplemental letter. With regard to your commitment to revise the pressure-temperature limit curves in the TS, the staff has found that reasonable controls for the implementation and subsequent evaluation of proposed changes perta...
Attached is a request for changes to the Technical Specifications of the Operating License for the M...
Company (FPL) requested to amend Renewed Facility Operating License No. NPF-16 and revise the St. Lu...
an amendment to the above license in the form of changes to the technical specifications. The propos...
June 25, 2001, to increase the licensed thermal power level and to change the Technical Specificatio...
Company (FPL) requested to amend Renewed Facility Operating License No. DPR-67 and revise the St. Lu...
(NSPM),(') submitted a request to revise the allowable value and channel calibration surveillan...
Company (FPL) requested to amend Renewed Facility Operating License No. NPF-16 and revise the St. Lu...
These amendments approve: (1) implementation of the revised thermal design procedure (RTDP), (2) re...
Renewed Facility Operating License No. NPF-1 6 and revise the St. Lucie Unit 2 Technical Specificati...
The amendments consist of changes to the Technical Specifications (TS) in response to your applicati...
increase each unit's licensed core power level from 2300 megawatts thermal (MWt) to 2644 MWt an...
The amendment revises the Appendix A Technical Specifications (TSs) relating to Reactor Coolant Syst...
The amendment revises the values of the Safety Limit Minimum Critical Power Ratio (SLMCPR) contained...
This amendment (I) authorizes an increase in power level from 10 % to 20 % below which the Rod Worth...
The amendment modifies Technical Specifications (TSs) to relocate the boration subsystem and Residua...
Attached is a request for changes to the Technical Specifications of the Operating License for the M...
Company (FPL) requested to amend Renewed Facility Operating License No. NPF-16 and revise the St. Lu...
an amendment to the above license in the form of changes to the technical specifications. The propos...
June 25, 2001, to increase the licensed thermal power level and to change the Technical Specificatio...
Company (FPL) requested to amend Renewed Facility Operating License No. DPR-67 and revise the St. Lu...
(NSPM),(') submitted a request to revise the allowable value and channel calibration surveillan...
Company (FPL) requested to amend Renewed Facility Operating License No. NPF-16 and revise the St. Lu...
These amendments approve: (1) implementation of the revised thermal design procedure (RTDP), (2) re...
Renewed Facility Operating License No. NPF-1 6 and revise the St. Lucie Unit 2 Technical Specificati...
The amendments consist of changes to the Technical Specifications (TS) in response to your applicati...
increase each unit's licensed core power level from 2300 megawatts thermal (MWt) to 2644 MWt an...
The amendment revises the Appendix A Technical Specifications (TSs) relating to Reactor Coolant Syst...
The amendment revises the values of the Safety Limit Minimum Critical Power Ratio (SLMCPR) contained...
This amendment (I) authorizes an increase in power level from 10 % to 20 % below which the Rod Worth...
The amendment modifies Technical Specifications (TSs) to relocate the boration subsystem and Residua...
Attached is a request for changes to the Technical Specifications of the Operating License for the M...
Company (FPL) requested to amend Renewed Facility Operating License No. NPF-16 and revise the St. Lu...
an amendment to the above license in the form of changes to the technical specifications. The propos...