Company (FPL) requested to amend Renewed Facility Operating License No. NPF-16 and revise the St. Lucie Unit 2 Technical Specifications (TS). The proposed amendment will increase the unit's licensed core thermal power level from 2700 megawatts thermal (MWt) to 3020 MWt and revise the Renewed Facility Operating License and TS to support operation at this increased core thermal power level. This represents an approximate increase of 11.85 % and is therefore considered an Extended Power Uprate (EPU). By email from the NRC Project Manager dated August 2, 2011 [Reference 2], additional information related to human factors was requested by the NRC staff in the Health Physics and Human Performance Branch (IHPB) to support their review of the ...
Company (CP&L) submitted license amendment requests to revise the Harris Nuclear Plant (HNP) Fac...
On July 9, 2001, a conference call was held with the NRC Staff regarding the referenced amendment re...
and revise the Turkey Point Units 3 and 4 Technical Specifications (TS). The proposed amendment will...
Renewed Facility Operating License No. NPF-1 6 and revise the St. Lucie Unit 2 Technical Specificati...
Company (FPL) requested to amend Renewed Facility Operating License No. NPF-16 and revise the St. Lu...
Company (FPL) requested to amend Renewed Facility Operating License No. DPR-67 and revise the St. Lu...
Company (FPL) requested to amend Renewed Facility Operating License No. NPF-16 and revise the St. Lu...
Accession No. ML1 1314A1 11. (3) Email from T. Orf (NRC) to L. Abbott (FPL). Subject: "St. Luci...
increase each unit's licensed core power level from 2300 megawatts thermal (MWt) to 2644 MWt an...
the Turkey Point Units 3 and 4 Technical Specifications (TS). The proposed amendment will increase e...
(DEK), requested an amendment to Facility Operating License Number DPR-43 for Kewaunee Power Station...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
(NSPM),(') submitted a request to revise the allowable value and channel calibration surveillan...
P PL. This letter forwards proprietary information in accordance with 10 CFR 2.390. The balance of t...
2000 In the referenced letter, Commonwealth Edison (ComEd) Company, now Exelon Generation Company (E...
Company (CP&L) submitted license amendment requests to revise the Harris Nuclear Plant (HNP) Fac...
On July 9, 2001, a conference call was held with the NRC Staff regarding the referenced amendment re...
and revise the Turkey Point Units 3 and 4 Technical Specifications (TS). The proposed amendment will...
Renewed Facility Operating License No. NPF-1 6 and revise the St. Lucie Unit 2 Technical Specificati...
Company (FPL) requested to amend Renewed Facility Operating License No. NPF-16 and revise the St. Lu...
Company (FPL) requested to amend Renewed Facility Operating License No. DPR-67 and revise the St. Lu...
Company (FPL) requested to amend Renewed Facility Operating License No. NPF-16 and revise the St. Lu...
Accession No. ML1 1314A1 11. (3) Email from T. Orf (NRC) to L. Abbott (FPL). Subject: "St. Luci...
increase each unit's licensed core power level from 2300 megawatts thermal (MWt) to 2644 MWt an...
the Turkey Point Units 3 and 4 Technical Specifications (TS). The proposed amendment will increase e...
(DEK), requested an amendment to Facility Operating License Number DPR-43 for Kewaunee Power Station...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
(NSPM),(') submitted a request to revise the allowable value and channel calibration surveillan...
P PL. This letter forwards proprietary information in accordance with 10 CFR 2.390. The balance of t...
2000 In the referenced letter, Commonwealth Edison (ComEd) Company, now Exelon Generation Company (E...
Company (CP&L) submitted license amendment requests to revise the Harris Nuclear Plant (HNP) Fac...
On July 9, 2001, a conference call was held with the NRC Staff regarding the referenced amendment re...
and revise the Turkey Point Units 3 and 4 Technical Specifications (TS). The proposed amendment will...