The amendment would increase the engineered safety features (ESF) response time for Low Steamline Pressure in Technical Specification Table 3.3-5, Item 4.a by 15 seconds to 27 seconds with offsite power and 37 seconds without offsite power. The staff has reviewed the circumstances associated with your request and has concluded that this change is needed to avoid a delay in startup. Therefore, in accordance with 10 CFR 50.91(a)(5), justification for the issuance of an emergency technical specification change existed. A notice of Consideration of Issuance of Amendment to License will be included in the Commission's biweekly Federal Register notices. A copy of our related Safety Evaluation is enclosed. Sincerely
The purpose of this letter is for the Nebraska Public Power District (NPPD) to request an amendment ...
the Oconee Nuclear Station, Units Nos. 1, 2 and 3. These amendments consist of changes to the Statio...
In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit or ...
response to your application dated June 20, 1995, as supplemented August 30, 1995. This amendment al...
(NSPM),(') submitted a request to revise the allowable value and channel calibration surveillan...
1985. The amendment modifies the Technical Specifications to reflect a 1.9 % reduction in thermal de...
amendment consists of changes to the Technical Specifications (TSs) in response to your application ...
Unit 1 and Unit 2 Technical Specifications (TS) for the Edwin I. Hatch Nuclear Plant. The amendment ...
have been received, and a new version was submitted on February 13, 2001, and was supplemented by le...
an amendment to the above license in the form of changes to the technical specifications. The propos...
allowed outage time (AOT) from 72 hours to 14 days for an inoperable emergency diesel generator (EDG...
In accordance with 10 CFR 50.90, "Application for amendment of license or construction permit, ...
Gentlemen: This letter supplements and supercedes previously submitted Licensing Amendment Request (...
Amendment Request (LAR) 12-01 to revise the Seabrook Station Emergency Plan. The proposed changes ar...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
The purpose of this letter is for the Nebraska Public Power District (NPPD) to request an amendment ...
the Oconee Nuclear Station, Units Nos. 1, 2 and 3. These amendments consist of changes to the Statio...
In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit or ...
response to your application dated June 20, 1995, as supplemented August 30, 1995. This amendment al...
(NSPM),(') submitted a request to revise the allowable value and channel calibration surveillan...
1985. The amendment modifies the Technical Specifications to reflect a 1.9 % reduction in thermal de...
amendment consists of changes to the Technical Specifications (TSs) in response to your application ...
Unit 1 and Unit 2 Technical Specifications (TS) for the Edwin I. Hatch Nuclear Plant. The amendment ...
have been received, and a new version was submitted on February 13, 2001, and was supplemented by le...
an amendment to the above license in the form of changes to the technical specifications. The propos...
allowed outage time (AOT) from 72 hours to 14 days for an inoperable emergency diesel generator (EDG...
In accordance with 10 CFR 50.90, "Application for amendment of license or construction permit, ...
Gentlemen: This letter supplements and supercedes previously submitted Licensing Amendment Request (...
Amendment Request (LAR) 12-01 to revise the Seabrook Station Emergency Plan. The proposed changes ar...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
The purpose of this letter is for the Nebraska Public Power District (NPPD) to request an amendment ...
the Oconee Nuclear Station, Units Nos. 1, 2 and 3. These amendments consist of changes to the Statio...
In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit or ...