1985. The amendment modifies the Technical Specifications to reflect a 1.9 % reduction in thermal design flow. The amendment is effective seven days after its date of issuance. A copy of the related safety evaluation supporting Amendment No.45 to Facility Operating License NPF-12 is enclosed. Notice of issuance will be included in the Commission's next monthly Federal Register notice. Sincerely
amendment consists of changes to the Technical Specifications (TSs) in response to your application ...
the amendment modifies Technical Specification 6.8.1.6.b to include a reference to the NRC Westingho...
ANALYSIS METHODOLOGY (TAC NO. MC8427) Dear Mr. Kansler: The Commission has issued the enclosed Amend...
These amendments approve: (1) implementation of the revised thermal design procedure (RTDP), (2) re...
Station. The amendment consists of changes to the Technical Specifications (Appendix B) in response ...
The amendment would increase the engineered safety features (ESF) response time for Low Steamline Pr...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
to Facility Operating License No. NPF-12 for the Virgil C. Summer Nuclear Station, Unit No. 1. The a...
located in Fairfield County, South Carolina. This amendment is in response to yeur letter dated June...
The amendment revises the Appendix A Technical Specifications (TSs) relating to Reactor Coolant Syst...
The amendment consists of changes to the Technical Specifications in response to your application da...
(NSPM),(') submitted a request to revise the allowable value and channel calibration surveillan...
licensee) requested an amendment to Facility Operating License No. DPR-22 for the Monticello Nuclear...
SUBJECT: ISSUANCE OF AMENDMENT NO. 150 TO FACILITY OPERATING LICENSE NO. DPR-35, PILGRIM NUCLEAR POW...
The Commission has issued the enclosed Amendment No.132 to Facility Operating License No. DPR-35 for...
amendment consists of changes to the Technical Specifications (TSs) in response to your application ...
the amendment modifies Technical Specification 6.8.1.6.b to include a reference to the NRC Westingho...
ANALYSIS METHODOLOGY (TAC NO. MC8427) Dear Mr. Kansler: The Commission has issued the enclosed Amend...
These amendments approve: (1) implementation of the revised thermal design procedure (RTDP), (2) re...
Station. The amendment consists of changes to the Technical Specifications (Appendix B) in response ...
The amendment would increase the engineered safety features (ESF) response time for Low Steamline Pr...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
to Facility Operating License No. NPF-12 for the Virgil C. Summer Nuclear Station, Unit No. 1. The a...
located in Fairfield County, South Carolina. This amendment is in response to yeur letter dated June...
The amendment revises the Appendix A Technical Specifications (TSs) relating to Reactor Coolant Syst...
The amendment consists of changes to the Technical Specifications in response to your application da...
(NSPM),(') submitted a request to revise the allowable value and channel calibration surveillan...
licensee) requested an amendment to Facility Operating License No. DPR-22 for the Monticello Nuclear...
SUBJECT: ISSUANCE OF AMENDMENT NO. 150 TO FACILITY OPERATING LICENSE NO. DPR-35, PILGRIM NUCLEAR POW...
The Commission has issued the enclosed Amendment No.132 to Facility Operating License No. DPR-35 for...
amendment consists of changes to the Technical Specifications (TSs) in response to your application ...
the amendment modifies Technical Specification 6.8.1.6.b to include a reference to the NRC Westingho...
ANALYSIS METHODOLOGY (TAC NO. MC8427) Dear Mr. Kansler: The Commission has issued the enclosed Amend...