have been received, and a new version was submitted on February 13, 2001, and was supplemented by letter dated July 3, 2001. CE NPSD-1186, Rev. 00 requests changes in the end state technical specification (TS) for numerous allowed outage time (AOT) requirements. Most of the requested TS changes are to permit an end state of hot shutdown (Mode 4) rather than cold shutdown (Mode 5) end state that is contained in the current TSs. The staff has found that CE NPSD-1186, Rev. 00, "Technical Justification for the Risk Informed Modification to Selected Required Action End States for CEOG Member PWRs, " dated February 13, 2001, as supplemented by letter dated July 3, 2001, is acceptable for referencing in licensing applications for Combust...
The amendments consist of changes to the Technical Specifications (TS) in response to your applicati...
The amendment would increase the engineered safety features (ESF) response time for Low Steamline Pr...
Attached is a request for changes to the Technical Specifications of the Operating License for the M...
(NSPM),(') submitted a request to revise the allowable value and channel calibration surveillan...
Containment Integrity During Design-Basis Accident Conditions. " Specifically, in that letter, ...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
The amendment modifies Technical Specifications (TSs) to relocate the boration subsystem and Residua...
response to your application dated June 20, 1995, as supplemented August 30, 1995. This amendment al...
containment requirements during handling of irradiated fuel and core alterations, " Revision 2,...
Gentlemen: This letter supplements and supercedes previously submitted Licensing Amendment Request (...
Unit 1 and Unit 2 Technical Specifications (TS) for the Edwin I. Hatch Nuclear Plant. The amendment ...
ANALYSIS METHODOLOGY (TAC NO. MC8427) Dear Mr. Kansler: The Commission has issued the enclosed Amend...
The amendment revises the values of the Safety Limit Minimum Critical Power Ratio (SLMCPR) contained...
These amendments approve: (1) implementation of the revised thermal design procedure (RTDP), (2) re...
Commission contain technical specifications that set forth the limits, operating conditions, and oth...
The amendments consist of changes to the Technical Specifications (TS) in response to your applicati...
The amendment would increase the engineered safety features (ESF) response time for Low Steamline Pr...
Attached is a request for changes to the Technical Specifications of the Operating License for the M...
(NSPM),(') submitted a request to revise the allowable value and channel calibration surveillan...
Containment Integrity During Design-Basis Accident Conditions. " Specifically, in that letter, ...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
The amendment modifies Technical Specifications (TSs) to relocate the boration subsystem and Residua...
response to your application dated June 20, 1995, as supplemented August 30, 1995. This amendment al...
containment requirements during handling of irradiated fuel and core alterations, " Revision 2,...
Gentlemen: This letter supplements and supercedes previously submitted Licensing Amendment Request (...
Unit 1 and Unit 2 Technical Specifications (TS) for the Edwin I. Hatch Nuclear Plant. The amendment ...
ANALYSIS METHODOLOGY (TAC NO. MC8427) Dear Mr. Kansler: The Commission has issued the enclosed Amend...
The amendment revises the values of the Safety Limit Minimum Critical Power Ratio (SLMCPR) contained...
These amendments approve: (1) implementation of the revised thermal design procedure (RTDP), (2) re...
Commission contain technical specifications that set forth the limits, operating conditions, and oth...
The amendments consist of changes to the Technical Specifications (TS) in response to your applicati...
The amendment would increase the engineered safety features (ESF) response time for Low Steamline Pr...
Attached is a request for changes to the Technical Specifications of the Operating License for the M...