Containment Integrity During Design-Basis Accident Conditions. " Specifically, in that letter, the NRC Staff accepted Entergy Operations, Inc.'s (Entergy) commitment to resolve the ten remaining containment penetrations of an original seventeen penetrations that were potentially susceptible to thermally induced overpressurization through an evaluation, detailed analysis, or installation of physical modifications prior to startup from the Spring 2002 (March) refueling outage. Entergy determined the permanent resolution to the GL96-06 issues for the ten remaining containment penetrations could be satisfied through the installation of thermal relief valves on three of the containment penetrations during Refuel Outage 11 and a change ...
Entergy is hereby submitting a request for NRC Staff review of and concurrence with an existing devi...
This letter requests NRC approval of Relief Request No. 29 in support of the current refueling and i...
This letter provides additional information regarding the application by Entergy Nuclear Vermont Yan...
have been received, and a new version was submitted on February 13, 2001, and was supplemented by le...
(DEK) hereby requests NRC approval of the attached proposed 10 CFR 50.55a request (RR-2-3) for the F...
(DEK) hereby requests NRC approval of'the attached proposed 10 CFR 50.55a request (RR-2-4) for ...
However, provisions stated in footnote 6 to 10 CFR 50.55a provide for the use of other Code Cases up...
amendment of the River Bend Station (RBS) Operating License, No. NPF-47. This letter revises that re...
Unit 2A Steam Generator tubesheet to shell weld, 2-SGA WG60, identified a subsurface flaw. A review ...
10 CFR 50.55a Request RR-2-3 proposed a temporary deviation from the requirements of ASME Section XI...
Entergy is amending its May 1, 2001 exemption request to incorporate several changes and improvement...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
Entergy Nuclear Operations, Inc. (Entergy or the licensee), submitted a license amendment request fo...
The purpose of this letter is to provide a status of the NRC staffs review of the hydrodynamic load ...
ANALYSIS METHODOLOGY (TAC NO. MC8427) Dear Mr. Kansler: The Commission has issued the enclosed Amend...
Entergy is hereby submitting a request for NRC Staff review of and concurrence with an existing devi...
This letter requests NRC approval of Relief Request No. 29 in support of the current refueling and i...
This letter provides additional information regarding the application by Entergy Nuclear Vermont Yan...
have been received, and a new version was submitted on February 13, 2001, and was supplemented by le...
(DEK) hereby requests NRC approval of the attached proposed 10 CFR 50.55a request (RR-2-3) for the F...
(DEK) hereby requests NRC approval of'the attached proposed 10 CFR 50.55a request (RR-2-4) for ...
However, provisions stated in footnote 6 to 10 CFR 50.55a provide for the use of other Code Cases up...
amendment of the River Bend Station (RBS) Operating License, No. NPF-47. This letter revises that re...
Unit 2A Steam Generator tubesheet to shell weld, 2-SGA WG60, identified a subsurface flaw. A review ...
10 CFR 50.55a Request RR-2-3 proposed a temporary deviation from the requirements of ASME Section XI...
Entergy is amending its May 1, 2001 exemption request to incorporate several changes and improvement...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
Entergy Nuclear Operations, Inc. (Entergy or the licensee), submitted a license amendment request fo...
The purpose of this letter is to provide a status of the NRC staffs review of the hydrodynamic load ...
ANALYSIS METHODOLOGY (TAC NO. MC8427) Dear Mr. Kansler: The Commission has issued the enclosed Amend...
Entergy is hereby submitting a request for NRC Staff review of and concurrence with an existing devi...
This letter requests NRC approval of Relief Request No. 29 in support of the current refueling and i...
This letter provides additional information regarding the application by Entergy Nuclear Vermont Yan...