This letter provides additional information regarding the application by Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (Entergy) for a license amendment (Reference 1) to increase the maximum authorized power level of the Vermont Yankee Nuclear Power Station (VYNPS) from 1593 megawatts thermal (MWt) to 1912 MWt. This submittal responds to the remaining request for additional information questions from NRC's letter of July 27, 2005 (Reference 2). Entergy had previously provided a response to approximately half of those questions in its response dated August 1, 2005 (Reference 3)
2000 In the referenced letter, Commonwealth Edison (ComEd) Company, now Exelon Generation Company (E...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
a change to the Millstone Unit No. 3 Technical Specifications. The proposed changes were primarily a...
of the NRC Staff regarding the referenced amendment request to increase the authorized license power...
On June 8, 2001, a conference call was held with the NRC Staff regarding the referenced amendment re...
2000 In the referenced letter, Commonwealth Edison (ComEd) Company, now Exelon Generation Company (E...
Company (CP&L) submitted license amendment requests to revise the Harris Nuclear Plant (HNP) Fac...
Company (FPL) requested to amend Renewed Facility Operating License No. DPR-67 and revise the St. Lu...
Subject: Revised Responses to MELLLA+ RAIs (IAC No MB6157) In References 1 and 2, GE responded to NR...
Unit 1 and Unit 2 Technical Specifications (TS) for the Edwin I. Hatch Nuclear Plant. The amendment ...
License DPR-28 for Vermont Yankee Nuclear Power Station (VY) to relocate Technical Specification req...
Additional Information. Twenty-six questions, associated with the NRC Staff's review of GE Nucl...
(DEK), requested an amendment to Facility Operating License Number DPR-43 for Kewaunee Power Station...
Entergy is amending its May 1, 2001 exemption request to incorporate several changes and improvement...
increase each unit's licensed core power level from 2300 megawatts thermal (MWt) to 2644 MWt an...
2000 In the referenced letter, Commonwealth Edison (ComEd) Company, now Exelon Generation Company (E...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
a change to the Millstone Unit No. 3 Technical Specifications. The proposed changes were primarily a...
of the NRC Staff regarding the referenced amendment request to increase the authorized license power...
On June 8, 2001, a conference call was held with the NRC Staff regarding the referenced amendment re...
2000 In the referenced letter, Commonwealth Edison (ComEd) Company, now Exelon Generation Company (E...
Company (CP&L) submitted license amendment requests to revise the Harris Nuclear Plant (HNP) Fac...
Company (FPL) requested to amend Renewed Facility Operating License No. DPR-67 and revise the St. Lu...
Subject: Revised Responses to MELLLA+ RAIs (IAC No MB6157) In References 1 and 2, GE responded to NR...
Unit 1 and Unit 2 Technical Specifications (TS) for the Edwin I. Hatch Nuclear Plant. The amendment ...
License DPR-28 for Vermont Yankee Nuclear Power Station (VY) to relocate Technical Specification req...
Additional Information. Twenty-six questions, associated with the NRC Staff's review of GE Nucl...
(DEK), requested an amendment to Facility Operating License Number DPR-43 for Kewaunee Power Station...
Entergy is amending its May 1, 2001 exemption request to incorporate several changes and improvement...
increase each unit's licensed core power level from 2300 megawatts thermal (MWt) to 2644 MWt an...
2000 In the referenced letter, Commonwealth Edison (ComEd) Company, now Exelon Generation Company (E...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
a change to the Millstone Unit No. 3 Technical Specifications. The proposed changes were primarily a...