Letter: From J.F Friedkin, to Terrance G. Leonhardy, Esquire, January 16, 1965 (thermofax), page 3CONFIDENTIAL -3- Mexico further understands and points to the need that the bottom of the unlined extension channel be constructed at approximately the same level as the bed of the Colorado River so as to avoid seepage of the saline waters from the extension channel to the river, as well as to avoid seepage to Yuma Valley lands. Mexico understands that decisions relating to the construction and maintenance of the control structure are solely for United States determination, and Mexico has been informed that insofar as the United States is concerned, the location of the structure is to be determined by the Department of the Interior. Me...