Letter: From Joseph F. Friedkin, to Dean Rusk, Secretary of State, March 26, 1964 (photocopy), page 2-2- I, therefore, recommend that authorization of the Lower Colorado River groundwater recovery feature not be one for immediate authorization, but rather be included among the features of the over-all plan required for detailed study. The aim is to avoid insofar as practical another serious and critically difficult water problem with Mexico, as that which now confronts us, and which we are committed to resolve. Section 3 (c) of the draft bill provides for construction of the Charleston Dam on San Pedro River as a part of the Central Arizona project. The plans should take into account, if they do not already, that of the total 1200 squ...