The Southern Nevada Water Project, a water supply system for the Las Vegas area, was authorized by the Acts of October 22, 1965, and July 19, 1966 (Public Laws 89-292 and 89-510). These acts authorized staged development. The first stage, completed in 1971, consists of intake facilities at Lake Mead, eight pumping plants, a main aqueduct 2-1/2-miles long, a 4-mile-long tunnel, and 30 miles of pipelines and laterals. The State of Nevada constructed the Alfred Merritt Smith Water Treatment Facility in conjunction with the first stage. The first stage system has the capacity to deliver 132,200 acre-feet per year. The second stage consists of five new pumping plants, modifications to four existing first stage pumping plants, a 2.5-mile-long sec...