This session concentrated on the main players affecting the availability of the LHC: the Quench Protection System (QPS), the cryogenics system, the regularly foreseen technical stops and the effect of radiation on equipment failures. A forecast for operation in 2012 was made for all these items
Reaching the challenging integrated luminosity production goals of a future circular hadron collider...
The HL-LHC has ambitious integrated luminosity goals in the region of 250 fb$^{-1}$ per year. This l...
Machine availability is one of the key performance indicators to reach the ambitious goals for integ...
During the LHC operation in 2010 and 2011, the cryogenic system has achieved an availability level f...
Availability is one of the key factors to be taken into account to improve the LHC performance after...
This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Te...
The potential limitations for future running of the LHC RF systems are presented. In particular the ...
The LHC perfromance and its overall machine availability are discussed, as well as the factors that ...
The LHC performance and its overall machine availability are discussed, as well as the factors the f...
The MPE/circuit protection section is presently establishing a road map for its future LHC activitie...
This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Te...
This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Te...
The presentation will explain all the proposed changes and discuss the impact on other shutdown acti...
This paper summarises the two sessions, which were devoted to the activities planned for the next lo...
One of the main goals of the CERN Long-Shutdown 2 (LS2) is to improve the performance of the injecto...
Reaching the challenging integrated luminosity production goals of a future circular hadron collider...
The HL-LHC has ambitious integrated luminosity goals in the region of 250 fb$^{-1}$ per year. This l...
Machine availability is one of the key performance indicators to reach the ambitious goals for integ...
During the LHC operation in 2010 and 2011, the cryogenic system has achieved an availability level f...
Availability is one of the key factors to be taken into account to improve the LHC performance after...
This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Te...
The potential limitations for future running of the LHC RF systems are presented. In particular the ...
The LHC perfromance and its overall machine availability are discussed, as well as the factors that ...
The LHC performance and its overall machine availability are discussed, as well as the factors the f...
The MPE/circuit protection section is presently establishing a road map for its future LHC activitie...
This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Te...
This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Te...
The presentation will explain all the proposed changes and discuss the impact on other shutdown acti...
This paper summarises the two sessions, which were devoted to the activities planned for the next lo...
One of the main goals of the CERN Long-Shutdown 2 (LS2) is to improve the performance of the injecto...
Reaching the challenging integrated luminosity production goals of a future circular hadron collider...
The HL-LHC has ambitious integrated luminosity goals in the region of 250 fb$^{-1}$ per year. This l...
Machine availability is one of the key performance indicators to reach the ambitious goals for integ...