Availability is one of the key factors to be taken into account to improve the LHC performance after LS1 and for future LHC upgrades. A comprehensive view of LHC availability in 2012 is given in this paper, based on the analyses of the Availability Working Group. The main contributions to LHC un-availability for Post-LS1 operation are highlighted following the outcomes of the Dependability Workshop, held in November 2013. Goals and foreseen project stages of the Accelerator Fault Tracking (AFT) are presented. Integrated luminosity predictions and sensitivity analyses to relevant operational parameters are shown, as a function of possible future availability scenarios
One of the main goals of the CERN Long-Shutdown 2 (LS2) is to improve the performance of the injecto...
This document summarises the LHC machine availability for the period of Restart to Technical Stop 1 ...
The goal of Long Shutdown 1 (LS1) is to perform the full maintenance of equipment, and the necessary...
Availability is one of the key performance indicators of LHC operation, being directly correlated wi...
The HL-LHC has ambitious integrated luminosity goals in the region of 250 fb$^{-1}$ per year. This l...
Machine availability is one of the key performance indicators to reach the ambitious goals for integ...
This document summarises the LHC machine availability for the period of Restart to Technical Stop 1 ...
This document summarises the LHC machine availability for the period of Restart to Technical Stop 1 ...
This session concentrated on the main players affecting the availability of the LHC: the Quench Prot...
The LHC collimation system must be available in all phases of the machine operation in order to hand...
Reaching the challenging integrated luminosity production goals of a future circular hadron collider...
The LHC perfromance and its overall machine availability are discussed, as well as the factors that ...
This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Te...
This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Te...
This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Te...
One of the main goals of the CERN Long-Shutdown 2 (LS2) is to improve the performance of the injecto...
This document summarises the LHC machine availability for the period of Restart to Technical Stop 1 ...
The goal of Long Shutdown 1 (LS1) is to perform the full maintenance of equipment, and the necessary...
Availability is one of the key performance indicators of LHC operation, being directly correlated wi...
The HL-LHC has ambitious integrated luminosity goals in the region of 250 fb$^{-1}$ per year. This l...
Machine availability is one of the key performance indicators to reach the ambitious goals for integ...
This document summarises the LHC machine availability for the period of Restart to Technical Stop 1 ...
This document summarises the LHC machine availability for the period of Restart to Technical Stop 1 ...
This session concentrated on the main players affecting the availability of the LHC: the Quench Prot...
The LHC collimation system must be available in all phases of the machine operation in order to hand...
Reaching the challenging integrated luminosity production goals of a future circular hadron collider...
The LHC perfromance and its overall machine availability are discussed, as well as the factors that ...
This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Te...
This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Te...
This document summarises the LHC machine availability for the period of Technical Stop 1 (TS1) to Te...
One of the main goals of the CERN Long-Shutdown 2 (LS2) is to improve the performance of the injecto...
This document summarises the LHC machine availability for the period of Restart to Technical Stop 1 ...
The goal of Long Shutdown 1 (LS1) is to perform the full maintenance of equipment, and the necessary...