The LHC performance and its overall machine availability are discussed, as well as the factors the factor that contributed to an excellent LHC performance in 2011
This session concentrated on the main players affecting the availability of the LHC: the Quench Prot...
Abstract. The LHC Run I was successfully concluded in March 2012. An incredible amount of data has b...
The path taken by the LHC team to reach 3.6 1033 cm−2 s−1 instantaneous luminosity, and to deliver 5...
The LHC perfromance and its overall machine availability are discussed, as well as the factors that ...
The characteristics of the various LHC beams have been defined long before the LHC became operationa...
In 2011, the LHC entered its phase of real luminosity production, with more than 5 fb - 1 delivered ...
In 2011 the LHC moved from commissioning into the physics production phase with the aim of accumulat...
The LHC Run I was successfully concluded in March 2012. An incredible amount of data has been collec...
During the Chamonix 2011 workshop on LHC performance, topics relevant to take decisions to guarantee...
In 2011 and 2012 LHC Machine Development (MD) sessions were performed during dedicated slots of beam...
The operational performance of the LHC machine both for proton and lead ion operation are reviewed ...
The HL-LHC has ambitious integrated luminosity goals in the region of 250 fb$^{-1}$ per year. This l...
This chapter describes the current status of the LHC. General machine parameters are reviewed and th...
The 2011 LHC run is reviewed from the experiments' perspective. The LHC achievements directly relate...
The LHC Beam Operation workshop 2011 took place 12th - 14th December. The principle aims of the work...
This session concentrated on the main players affecting the availability of the LHC: the Quench Prot...
Abstract. The LHC Run I was successfully concluded in March 2012. An incredible amount of data has b...
The path taken by the LHC team to reach 3.6 1033 cm−2 s−1 instantaneous luminosity, and to deliver 5...
The LHC perfromance and its overall machine availability are discussed, as well as the factors that ...
The characteristics of the various LHC beams have been defined long before the LHC became operationa...
In 2011, the LHC entered its phase of real luminosity production, with more than 5 fb - 1 delivered ...
In 2011 the LHC moved from commissioning into the physics production phase with the aim of accumulat...
The LHC Run I was successfully concluded in March 2012. An incredible amount of data has been collec...
During the Chamonix 2011 workshop on LHC performance, topics relevant to take decisions to guarantee...
In 2011 and 2012 LHC Machine Development (MD) sessions were performed during dedicated slots of beam...
The operational performance of the LHC machine both for proton and lead ion operation are reviewed ...
The HL-LHC has ambitious integrated luminosity goals in the region of 250 fb$^{-1}$ per year. This l...
This chapter describes the current status of the LHC. General machine parameters are reviewed and th...
The 2011 LHC run is reviewed from the experiments' perspective. The LHC achievements directly relate...
The LHC Beam Operation workshop 2011 took place 12th - 14th December. The principle aims of the work...
This session concentrated on the main players affecting the availability of the LHC: the Quench Prot...
Abstract. The LHC Run I was successfully concluded in March 2012. An incredible amount of data has b...
The path taken by the LHC team to reach 3.6 1033 cm−2 s−1 instantaneous luminosity, and to deliver 5...