to Wheeler Ridge Pumping Plant, and from that location through the new canal to Tule River. In addition, offstream reservoirs at Hungry Hollow site on Deer Creek, and Owens Mountain site on Little Dry Creek would be included for storage. Estimated capital cost of the additional facilities proposed for east side service is $375,000,000 (reconnaissance). Annual OM&R costs are estimated at $1,450,000. Estimated costs of pumping the water for serving East Side San Joaquin Valley areas are $9,400,000. Subsequent early authorization of additional works would be required to provide increased East Side Division service through facilities on the east side of San Joaquin Valley from the Delta to connect at Tule River with the features proposed unde...