The reservoir storage systems and related diversions to Sacramento River proposed under this plan should be authorized for construction and operation by the Bureau of Reclamation as part of the Pacific Southwest Water Plan, even though they will be integrated closely with existing and proposed features of the Federal Central Valley Project. Associated with this development would be the East Side Division, which would provide 1,500,000 acre-feet of service to that area with its resulting multiple-purpose benefits. The estimated capital cost of the proposed facilities, exclusive of distribution systems, required for East Side Division is about $600,000,000. This East Side Division is proposed for authorization, construction, and operation as...