Two other facilities--the Delta Peripheral Canal and the Kellog Unit--also should be associated with this proposed plan for authorization as part of the Central Valley Project, with financial participation by the State and other agencies as appropriate. These facilities will offset, in particular, adverse effects which may occur to water supplies in the Delta area due to further water supply development in the Central Valley Basin and increased diversions from the Delta. The total capital costs of these features are estimated at $125,000,000, with annual OM&R and pumping costs of $1,200,000. 4Epson Perfection 4870 Photo, 400 dpi, 8 bit, 14,397,440 byte
Document: Bureau of Reclamation Appendix to Pacific Southwest Water Plan "Plan 6", August 1963 page ...
to Wheeler Ridge Pumping Plant, and from that location through the new canal to Tule River. In addit...
includes service to the San Joaquin Valley areas As an integral part of this plan of development, th...
as part of the Central Valley Project, with financial participation by the State and other agencies ...
Associated with this development would be the East Side Division, which would provide 1,500,000 acre...
Further development of water in the Central Valley Basin and increased diversions from the Delta, ei...
dissolved solids will average less than 200 parts per million. In addition, the channel will provide...
Document: Bureau of Reclamation Appendix to Pacific Southwest Water Plan "Plan 1", August 1963 page ...
The estimated capital cost of the Delta Peripheral Canal is $70,000,000, with an annual OM&R cost, i...
Document: Bureau of Reclamation Appendix to Pacific Southwest Water Plan "Plan 3", August 1963 page ...
Document: Bureau of Reclamation Appendix to Pacific Southwest Water Plan "Plan 4", August 1963 page ...
are proposed as an integral part of the Central Valley Project principally for water quality improve...
The reservoir storage systems and related diversions to Sacramento River proposed under this plan sh...
Document: Bureau of Reclamation Appendix to Pacific Southwest Water Plan "Plan 5", August 1963 page ...
Document: Bureau of Reclamation Appendix to Pacific Southwest Water Plan "Plan 7", August 1963 page ...
Document: Bureau of Reclamation Appendix to Pacific Southwest Water Plan "Plan 6", August 1963 page ...
to Wheeler Ridge Pumping Plant, and from that location through the new canal to Tule River. In addit...
includes service to the San Joaquin Valley areas As an integral part of this plan of development, th...
as part of the Central Valley Project, with financial participation by the State and other agencies ...
Associated with this development would be the East Side Division, which would provide 1,500,000 acre...
Further development of water in the Central Valley Basin and increased diversions from the Delta, ei...
dissolved solids will average less than 200 parts per million. In addition, the channel will provide...
Document: Bureau of Reclamation Appendix to Pacific Southwest Water Plan "Plan 1", August 1963 page ...
The estimated capital cost of the Delta Peripheral Canal is $70,000,000, with an annual OM&R cost, i...
Document: Bureau of Reclamation Appendix to Pacific Southwest Water Plan "Plan 3", August 1963 page ...
Document: Bureau of Reclamation Appendix to Pacific Southwest Water Plan "Plan 4", August 1963 page ...
are proposed as an integral part of the Central Valley Project principally for water quality improve...
The reservoir storage systems and related diversions to Sacramento River proposed under this plan sh...
Document: Bureau of Reclamation Appendix to Pacific Southwest Water Plan "Plan 5", August 1963 page ...
Document: Bureau of Reclamation Appendix to Pacific Southwest Water Plan "Plan 7", August 1963 page ...
Document: Bureau of Reclamation Appendix to Pacific Southwest Water Plan "Plan 6", August 1963 page ...
to Wheeler Ridge Pumping Plant, and from that location through the new canal to Tule River. In addit...
includes service to the San Joaquin Valley areas As an integral part of this plan of development, th...