The second month of the period covered by the MIT subcontract has seen the continuation of discussions between engineering representatives of IBM and MIT to further acquaint the former organization with the Air Defense System problem. On December 5, 1952 the Lincoln Project Subcontract No. 20 was signed by both companies
This memorandum outlines procedures for communication between MIT and IBM for work on the AN/FSQ-7 P...
Present: (IBM) B. Housman, R. W. Lowrie, R. C. Marden, D. C. Ross, C. E. Walston; (MIT) J. Giordano,...
In attendance: C. A. Rice, F. Moore, P. K. Philhower, C. F. Lynch, C. Watt, J. F. Martell, M. R. Zal...
This interval is the first month in which IBM is operating under prime contract with the Air Force. ...
Collaboration between Lincoln and IBM engineering groups has continued on all phases of development ...
Engineering collaboration with IBM has continued during this period. Study of all phases of the logi...
In the initial month following issuance of letter of intent considerable interchange of engineering ...
The continued engineering work on AN/FSQ-7 equipment during this period has covered considerable act...
The third month of the interval covered by the Subcontract between MIT and IBM has continued discuss...
Concurrence on basic circuit for the arithmetic element, magnetic core memory layout, drum logic and...
Joint engineering activity has resulted in engineering concurrence and Lincoln approval of additiona...
Discusses construction of the XD-1 prototype system, engineering refinement of design, initial insta...
MIT-IBM engineering concurrence has been reached on requests for DC buildings, equipment cooling, li...
Principal work during this period has been concerned with the display systems development and reduct...
Minutes of a Joint MIT - IBM Conference held at Hartford, Connecticut on January 20, 1953. The purp...
This memorandum outlines procedures for communication between MIT and IBM for work on the AN/FSQ-7 P...
Present: (IBM) B. Housman, R. W. Lowrie, R. C. Marden, D. C. Ross, C. E. Walston; (MIT) J. Giordano,...
In attendance: C. A. Rice, F. Moore, P. K. Philhower, C. F. Lynch, C. Watt, J. F. Martell, M. R. Zal...
This interval is the first month in which IBM is operating under prime contract with the Air Force. ...
Collaboration between Lincoln and IBM engineering groups has continued on all phases of development ...
Engineering collaboration with IBM has continued during this period. Study of all phases of the logi...
In the initial month following issuance of letter of intent considerable interchange of engineering ...
The continued engineering work on AN/FSQ-7 equipment during this period has covered considerable act...
The third month of the interval covered by the Subcontract between MIT and IBM has continued discuss...
Concurrence on basic circuit for the arithmetic element, magnetic core memory layout, drum logic and...
Joint engineering activity has resulted in engineering concurrence and Lincoln approval of additiona...
Discusses construction of the XD-1 prototype system, engineering refinement of design, initial insta...
MIT-IBM engineering concurrence has been reached on requests for DC buildings, equipment cooling, li...
Principal work during this period has been concerned with the display systems development and reduct...
Minutes of a Joint MIT - IBM Conference held at Hartford, Connecticut on January 20, 1953. The purp...
This memorandum outlines procedures for communication between MIT and IBM for work on the AN/FSQ-7 P...
Present: (IBM) B. Housman, R. W. Lowrie, R. C. Marden, D. C. Ross, C. E. Walston; (MIT) J. Giordano,...
In attendance: C. A. Rice, F. Moore, P. K. Philhower, C. F. Lynch, C. Watt, J. F. Martell, M. R. Zal...