Present: (IBM) B. Housman, R. W. Lowrie, R. C. Marden, D. C. Ross, C. E. Walston; (MIT) J. Giordano, N. T. Jones, R. P. Mayer, B. E. MorrissMinutes of an IBM-MIT concurrence meeting discussing two documents: an equipment list for AN/FSQ-7 Direction Center and specifications for the AN/FSQ-7 auxiliary console for XD-1, XD-2, and the production machine; as well as a review of the arithmetic compare proposal
The third month of the interval covered by the Subcontract between MIT and IBM has continued discuss...
MIT-IBM engineering concurrence has been reached on requests for DC buildings, equipment cooling, li...
A proposal for change in the plan for actual construction of the prototype models has been made by I...
Present: (IBM) F. A. Behnke, R. A. Imm, R. C. Eisele, M. C. Portanova; (MIT) J. D. Crane, E. L. Smil...
The 4th Meeting of the MIT-IBM Central Standards Committee was held Friday, Aug. 14, 1953 at MIT. ...
Minutes of a Joint MIT - IBM Conference held at Hartford, Connecticut on January 20, 1953. The purp...
Specifications for the display system, the power system and the internal memory will be prepared. Ou...
A conference reached agreement on the display specifications. They are presently being written up fo...
Present: (IBM) J. J. Coughlin, R. A. Imm, P. Longo, R. C. Marden, W. S. Squire, H. J. White; (MIT) H...
In the initial month following issuance of letter of intent considerable interchange of engineering ...
Present: (IBM) R. Imm, W. S. Squire, J. J. Coughlin, R. C. Marden, P. Longo; (MIT) R. D. Buzzard, W....
This memorandum outlines procedures for communication between MIT and IBM for work on the AN/FSQ-7 P...
Discusses construction of the XD-1 prototype system, engineering refinement of design, initial insta...
Principal work during this period has been concerned with the display systems development and reduct...
Present: (MIT) H. E. Anderson, J. J. Carson, S. T. Coffin, J. Giordano, A. D. Hughes, J. P. May, H. ...
The third month of the interval covered by the Subcontract between MIT and IBM has continued discuss...
MIT-IBM engineering concurrence has been reached on requests for DC buildings, equipment cooling, li...
A proposal for change in the plan for actual construction of the prototype models has been made by I...
Present: (IBM) F. A. Behnke, R. A. Imm, R. C. Eisele, M. C. Portanova; (MIT) J. D. Crane, E. L. Smil...
The 4th Meeting of the MIT-IBM Central Standards Committee was held Friday, Aug. 14, 1953 at MIT. ...
Minutes of a Joint MIT - IBM Conference held at Hartford, Connecticut on January 20, 1953. The purp...
Specifications for the display system, the power system and the internal memory will be prepared. Ou...
A conference reached agreement on the display specifications. They are presently being written up fo...
Present: (IBM) J. J. Coughlin, R. A. Imm, P. Longo, R. C. Marden, W. S. Squire, H. J. White; (MIT) H...
In the initial month following issuance of letter of intent considerable interchange of engineering ...
Present: (IBM) R. Imm, W. S. Squire, J. J. Coughlin, R. C. Marden, P. Longo; (MIT) R. D. Buzzard, W....
This memorandum outlines procedures for communication between MIT and IBM for work on the AN/FSQ-7 P...
Discusses construction of the XD-1 prototype system, engineering refinement of design, initial insta...
Principal work during this period has been concerned with the display systems development and reduct...
Present: (MIT) H. E. Anderson, J. J. Carson, S. T. Coffin, J. Giordano, A. D. Hughes, J. P. May, H. ...
The third month of the interval covered by the Subcontract between MIT and IBM has continued discuss...
MIT-IBM engineering concurrence has been reached on requests for DC buildings, equipment cooling, li...
A proposal for change in the plan for actual construction of the prototype models has been made by I...