Discusses construction of the XD-1 prototype system, engineering refinement of design, initial installation of equipment in Building F, AFCRC exhibit for both prototype and production system, equipment installation and check out of programs for the first production system, and formation of a joint MIT-IBM high level Coordination Committee.Summary of the collaboration between MIT and IBM between November 1-December 31, 1954
The continued engineering work on AN/FSQ-7 equipment during this period has covered considerable act...
Present: (IBM) F. A. Behnke, R. A. Imm, R. C. Eisele, M. C. Portanova; (MIT) J. D. Crane, E. L. Smil...
Concurrence on basic circuit for the arithmetic element, magnetic core memory layout, drum logic and...
MIT-IBM engineering concurrence has been reached on requests for DC buildings, equipment cooling, li...
In the initial month following issuance of letter of intent considerable interchange of engineering ...
Principal work during this period has been concerned with the display systems development and reduct...
The third month of the interval covered by the Subcontract between MIT and IBM has continued discuss...
A conference reached agreement on the display specifications. They are presently being written up fo...
Collaboration between Lincoln and IBM engineering groups has continued on all phases of development ...
Minutes of a Joint MIT - IBM Conference held at Hartford, Connecticut on January 20, 1953. The purp...
Joint engineering activity has resulted in engineering concurrence and Lincoln approval of additiona...
Engineering collaboration with IBM has continued during this period. Study of all phases of the logi...
Specifications for the display system, the power system and the internal memory will be prepared. Ou...
In attendance: C. A. Rice, F. Moore, P. K. Philhower, C. F. Lynch, C. Watt, J. F. Martell, M. R. Zal...
Present: (IBM) B. Housman, R. W. Lowrie, R. C. Marden, D. C. Ross, C. E. Walston; (MIT) J. Giordano,...
The continued engineering work on AN/FSQ-7 equipment during this period has covered considerable act...
Present: (IBM) F. A. Behnke, R. A. Imm, R. C. Eisele, M. C. Portanova; (MIT) J. D. Crane, E. L. Smil...
Concurrence on basic circuit for the arithmetic element, magnetic core memory layout, drum logic and...
MIT-IBM engineering concurrence has been reached on requests for DC buildings, equipment cooling, li...
In the initial month following issuance of letter of intent considerable interchange of engineering ...
Principal work during this period has been concerned with the display systems development and reduct...
The third month of the interval covered by the Subcontract between MIT and IBM has continued discuss...
A conference reached agreement on the display specifications. They are presently being written up fo...
Collaboration between Lincoln and IBM engineering groups has continued on all phases of development ...
Minutes of a Joint MIT - IBM Conference held at Hartford, Connecticut on January 20, 1953. The purp...
Joint engineering activity has resulted in engineering concurrence and Lincoln approval of additiona...
Engineering collaboration with IBM has continued during this period. Study of all phases of the logi...
Specifications for the display system, the power system and the internal memory will be prepared. Ou...
In attendance: C. A. Rice, F. Moore, P. K. Philhower, C. F. Lynch, C. Watt, J. F. Martell, M. R. Zal...
Present: (IBM) B. Housman, R. W. Lowrie, R. C. Marden, D. C. Ross, C. E. Walston; (MIT) J. Giordano,...
The continued engineering work on AN/FSQ-7 equipment during this period has covered considerable act...
Present: (IBM) F. A. Behnke, R. A. Imm, R. C. Eisele, M. C. Portanova; (MIT) J. D. Crane, E. L. Smil...
Concurrence on basic circuit for the arithmetic element, magnetic core memory layout, drum logic and...