An interim plan for wastewater management for the Millstone River Basin was prepared by the Department of Environmental Protection in August 1972. This document was to serve as a base for more detailed facility plans and projects that were proposed for the three major service areas in the Millstone Basin: the Upper Millstone, the Stony Brook, and the Lower Millstone. The interim plan summarized background data, water quality problems, existing and proposed waste discharges, and alternative conceptual plans to resolve existing problems while providing for future wastewater and water quality needs in the area. The interim plan did not, however, contain conclusions to the best plan for the Stony Brook Regional Sewerage Authority (SBRSA) distri...
This document consists of the appendices and plates (i.e. maps) of the Upper Raritan Watershed Wast...
This study of Regional Sewerage Facilities for the Tri-County area has been limited to those portion...
The Wastewater Management Plan was prepared to accommodate the estimated potential growth of the Wes...
This report outlines a multiple plant sewerage system to serve these portions of the Stony Brook and...
This report is an addendum to a previous report, "Environmental Assessment of the Expansion of the M...
Addendum 1 includes Sections A-8 through A-11 of the Wastewater Management Plan for Western Monmouth...
The objective of this interim plan is to document decisions that have been made regarding the Passai...
This report presents the results of the Phase I studies for the Manasquan River Regional Sewerage Au...
The Task 5 modeling report contained a description of the application of a model previously develope...
Marlin Estates and vicinity is a small section of Marlboro Township consisting of 108 existing struc...
The documents included are Addendum 3 and a supplemental report to Addendum 3 of the Wastewater Mana...
This report examines wastewater management alternatives in the Lower Great Egg Harbor River Region i...
Seven basic modes of wastewater collection, treatment and disposal are presented with discussion of ...
The Wastewater Facilities Plan provides a detailed analysis of the existing sewerage facilities in t...
This is a joint environmental engineering report prepared as a step in the planning of regional sewa...
This document consists of the appendices and plates (i.e. maps) of the Upper Raritan Watershed Wast...
This study of Regional Sewerage Facilities for the Tri-County area has been limited to those portion...
The Wastewater Management Plan was prepared to accommodate the estimated potential growth of the Wes...
This report outlines a multiple plant sewerage system to serve these portions of the Stony Brook and...
This report is an addendum to a previous report, "Environmental Assessment of the Expansion of the M...
Addendum 1 includes Sections A-8 through A-11 of the Wastewater Management Plan for Western Monmouth...
The objective of this interim plan is to document decisions that have been made regarding the Passai...
This report presents the results of the Phase I studies for the Manasquan River Regional Sewerage Au...
The Task 5 modeling report contained a description of the application of a model previously develope...
Marlin Estates and vicinity is a small section of Marlboro Township consisting of 108 existing struc...
The documents included are Addendum 3 and a supplemental report to Addendum 3 of the Wastewater Mana...
This report examines wastewater management alternatives in the Lower Great Egg Harbor River Region i...
Seven basic modes of wastewater collection, treatment and disposal are presented with discussion of ...
The Wastewater Facilities Plan provides a detailed analysis of the existing sewerage facilities in t...
This is a joint environmental engineering report prepared as a step in the planning of regional sewa...
This document consists of the appendices and plates (i.e. maps) of the Upper Raritan Watershed Wast...
This study of Regional Sewerage Facilities for the Tri-County area has been limited to those portion...
The Wastewater Management Plan was prepared to accommodate the estimated potential growth of the Wes...