and Unit 2. The proposed amendment will modify the TSs by removing the specific isolation time for the main steam and main feedwater isolation valves (MFIVs) from the associated TS Surveillanc
Station, Units Nos. 1, 2 and 3. These amendments consist of changes to the Station's-common Tec...
amendments, in the form of changes to the Technical Specifications (TS) to Facility Operating Licens...
In accordance with the provisions of 10 CFR 50.90, PPL Susquehanna, LLC (PPL) is submitting a reques...
requesting a revision to the Technical Specifications (TSs) for the Brunswick Stea
response to your application dated June 20, 1995, as supplemented August 30, 1995. This amendment al...
Attached is a license amendment request to eliminate local suppression pool temperature limits as th...
In accordance with 10 CFR 50.90, "Application for amendment of license or construction permit, ...
Ladies and Gentlemen: In accordance with the provisions of 10 CFR 50.90, Southern Nuclear Operating ...
A.10 CTS 4.6.3.1..a requires testing of each containment isolation valve that is a weight or spring ...
Station, Units Nos. 1, 2 and 3. These amendments consist of changes to the Station's common Tec...
the Oconee Nuclear Station, Units Nos. 1, 2 and 3. These amendments consist of changes to the Statio...
This amendment revises the Technical Specifications for Seabrook Station, Unit I involving removal o...
The amendment would increase the engineered safety features (ESF) response time for Low Steamline Pr...
proposed changes modify TS Section 3.5.1, "ECCS- Operating, " Surveillance Requirement (SR...
amendments in the form of revisions to Facility Operating License Numbers DPR-32 and DPR-37 for Surr...
Station, Units Nos. 1, 2 and 3. These amendments consist of changes to the Station's-common Tec...
amendments, in the form of changes to the Technical Specifications (TS) to Facility Operating Licens...
In accordance with the provisions of 10 CFR 50.90, PPL Susquehanna, LLC (PPL) is submitting a reques...
requesting a revision to the Technical Specifications (TSs) for the Brunswick Stea
response to your application dated June 20, 1995, as supplemented August 30, 1995. This amendment al...
Attached is a license amendment request to eliminate local suppression pool temperature limits as th...
In accordance with 10 CFR 50.90, "Application for amendment of license or construction permit, ...
Ladies and Gentlemen: In accordance with the provisions of 10 CFR 50.90, Southern Nuclear Operating ...
A.10 CTS 4.6.3.1..a requires testing of each containment isolation valve that is a weight or spring ...
Station, Units Nos. 1, 2 and 3. These amendments consist of changes to the Station's common Tec...
the Oconee Nuclear Station, Units Nos. 1, 2 and 3. These amendments consist of changes to the Statio...
This amendment revises the Technical Specifications for Seabrook Station, Unit I involving removal o...
The amendment would increase the engineered safety features (ESF) response time for Low Steamline Pr...
proposed changes modify TS Section 3.5.1, "ECCS- Operating, " Surveillance Requirement (SR...
amendments in the form of revisions to Facility Operating License Numbers DPR-32 and DPR-37 for Surr...
Station, Units Nos. 1, 2 and 3. These amendments consist of changes to the Station's-common Tec...
amendments, in the form of changes to the Technical Specifications (TS) to Facility Operating Licens...
In accordance with the provisions of 10 CFR 50.90, PPL Susquehanna, LLC (PPL) is submitting a reques...