amendments in the form of revisions to Facility Operating License Numbers DPR-32 and DPR-37 for Surry Power Station Units 1 and 2, respectively, to the Surry Technical Specifications (TSs), and to the associated TSs Bases. The proposed revision provides a separate allowed outage time (AOT) for the pressurizer power operated relief valve (PORV) backup air supply. The proposed revision includes the following specific changes: " * Addition of a 14-day AOT for the PORV backup air supply in TS 3.1 specifying that if the backup air supply is not returned to service within 14 days, be in at least hot shutdown within the next 6 hours and reduce Reactor Coolant System average temperature to < 350°F within the following 6 hours, " * Addi...
DPR-55 for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the...
consists of changes to the Technical Specifications (TSs) in response to your application dated Dece...
The amendments consist of changes to the Technical Specifications (TS) in response to your applicati...
an amendment to the above license in the form of changes to the technical specifications. The propos...
In accordance with the provisions of 10 CFR 50.90, TVA is submitting a request for a TS change (TS-4...
Operating License No. DPR-37 for the Surry Power Station, Unit Nos. 1 and 2, respectively. The amend...
In accordance with 10 CFR 50.90, "Application for amendment of license or construction permit, ...
amendments, in the form of changes to the Technical Specifications (TS) to Facility Operating Licens...
Attached is a request for changes to the Technical Specifications of the Operating License for the M...
Gentlemen: This letter supplements and supercedes previously submitted Licensing Amendment Request (...
allowed outage time (AOT) from 72 hours to 14 days for an inoperable emergency diesel generator (EDG...
(NSPM),(') submitted a request to revise the allowable value and channel calibration surveillan...
submitting a request for a TS change (TS-04-04) to Licenses DPR-77 and DPR-79 for SQN Units 1 and 2....
Specification (TS) change which would establish new interim maximum allowable power levels and chang...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
DPR-55 for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the...
consists of changes to the Technical Specifications (TSs) in response to your application dated Dece...
The amendments consist of changes to the Technical Specifications (TS) in response to your applicati...
an amendment to the above license in the form of changes to the technical specifications. The propos...
In accordance with the provisions of 10 CFR 50.90, TVA is submitting a request for a TS change (TS-4...
Operating License No. DPR-37 for the Surry Power Station, Unit Nos. 1 and 2, respectively. The amend...
In accordance with 10 CFR 50.90, "Application for amendment of license or construction permit, ...
amendments, in the form of changes to the Technical Specifications (TS) to Facility Operating Licens...
Attached is a request for changes to the Technical Specifications of the Operating License for the M...
Gentlemen: This letter supplements and supercedes previously submitted Licensing Amendment Request (...
allowed outage time (AOT) from 72 hours to 14 days for an inoperable emergency diesel generator (EDG...
(NSPM),(') submitted a request to revise the allowable value and channel calibration surveillan...
submitting a request for a TS change (TS-04-04) to Licenses DPR-77 and DPR-79 for SQN Units 1 and 2....
Specification (TS) change which would establish new interim maximum allowable power levels and chang...
These amendments increase the licensed power level by approximately 1.4 percent from 3,441 megawatts...
DPR-55 for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the...
consists of changes to the Technical Specifications (TSs) in response to your application dated Dece...
The amendments consist of changes to the Technical Specifications (TS) in response to your applicati...