Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when i...
The U.S.Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of E...
The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project lo...
Document: United States of America Federal Power Commission, Decision, Arizona Power Authority, Proj...
BPA has been asked by PPM Energy, Inc. to interconnect 300 megawatts (MW) of electricity generated f...
CARES proposes to construct and operate the 25 megawatt Columbia Wind Farm No. 1 (Project) in the Co...
This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been p...
The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power ...
The COB Energy Facility would be constructed on a site near the rural community of Bonanza, in Klama...
Anadarko Petroleum Corporation, Chandler and Associates, LLC, and Texaco Exploration and Production,...
Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transm...
The US Department of Energy, Western Area Power Administration (Western) proposes to replace an exis...
Tennessee Valley Authority (TVA) proposes to interconnect Calpine’s new Morgan Energy Center generat...
This EIS assesses environmental issues associated with constructing and demonstrating a project that...
Focus on Energy & Utilities piece on Hayes Gahagan, who is proposing a Loring BioEnergy plant in Li...
SRP is proposing to construct, own, and operate the Kyrene Expansion Project (KEP), which would expa...
The U.S.Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of E...
The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project lo...
Document: United States of America Federal Power Commission, Decision, Arizona Power Authority, Proj...
BPA has been asked by PPM Energy, Inc. to interconnect 300 megawatts (MW) of electricity generated f...
CARES proposes to construct and operate the 25 megawatt Columbia Wind Farm No. 1 (Project) in the Co...
This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been p...
The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power ...
The COB Energy Facility would be constructed on a site near the rural community of Bonanza, in Klama...
Anadarko Petroleum Corporation, Chandler and Associates, LLC, and Texaco Exploration and Production,...
Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transm...
The US Department of Energy, Western Area Power Administration (Western) proposes to replace an exis...
Tennessee Valley Authority (TVA) proposes to interconnect Calpine’s new Morgan Energy Center generat...
This EIS assesses environmental issues associated with constructing and demonstrating a project that...
Focus on Energy & Utilities piece on Hayes Gahagan, who is proposing a Loring BioEnergy plant in Li...
SRP is proposing to construct, own, and operate the Kyrene Expansion Project (KEP), which would expa...
The U.S.Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of E...
The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project lo...
Document: United States of America Federal Power Commission, Decision, Arizona Power Authority, Proj...