SRP is proposing to construct, own, and operate the Kyrene Expansion Project (KEP), which would expand the energy producing capacity of its existing Kyrene Generating Station in Tempe, Arizona. The proposed facility would consist of one natural gas-fired combined cycle system (stationary combustion turbine, stationary steam turbine, and heat recovery steam generator [HRSG]); one diesel-fired emergency fire water pump; one mechanical draft cooling tower; and associated water supply, water discharge, and natural gas pipelines.
At the request of Brad Richie, NPS Alaska Support Office and manager of the Brooks Camp relocation p...
The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power ...
The Town of Patagonia proposes to upgrade their existing wastewater treatment facilities and rehabil...
The Central Arizona Water Conservation District is proposing to construct and operate the Superstiti...
The US Energy Research and Development Administration (ERDA) has negotiated a contract with San Dieg...
The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand ...
Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griff...
The report analyzes the proposed power project which includes a 69kV transmission line and a 12/69kV...
The U.S. Department of Energy (DOE) proposes to provide funds for the construction and start-up of a...
The Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential ...
The YMCA Geothermal Heating project proposes to obtain approximately 57% of the total facility energ...
The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project lo...
The US Department of Energy (DOE) is considering a proposal from the California Energy Commission fo...
The 10,000-kilowatt Salton Sea Unit 1 power plant was designed to demonstrate that electrical power ...
The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA), evaluating the im...
At the request of Brad Richie, NPS Alaska Support Office and manager of the Brooks Camp relocation p...
The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power ...
The Town of Patagonia proposes to upgrade their existing wastewater treatment facilities and rehabil...
The Central Arizona Water Conservation District is proposing to construct and operate the Superstiti...
The US Energy Research and Development Administration (ERDA) has negotiated a contract with San Dieg...
The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand ...
Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griff...
The report analyzes the proposed power project which includes a 69kV transmission line and a 12/69kV...
The U.S. Department of Energy (DOE) proposes to provide funds for the construction and start-up of a...
The Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential ...
The YMCA Geothermal Heating project proposes to obtain approximately 57% of the total facility energ...
The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project lo...
The US Department of Energy (DOE) is considering a proposal from the California Energy Commission fo...
The 10,000-kilowatt Salton Sea Unit 1 power plant was designed to demonstrate that electrical power ...
The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA), evaluating the im...
At the request of Brad Richie, NPS Alaska Support Office and manager of the Brooks Camp relocation p...
The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power ...
The Town of Patagonia proposes to upgrade their existing wastewater treatment facilities and rehabil...