The Al-Hikmah Mosque Development Project, State University of Malang was built on an area of ± 9,000 m2 with a building area of ± 8,580 m2 with a total of 3 floors. Based on the weekly progress report in the 15th week which should have been completed 19.565% but in fact the progress obtained has only reached 16.727%. This means that the project is delayed by ±5% of the target that has been set. Project delays can be anticipated by accelerating project execution time and analyzing the effect of time that can be shortened by adding minimum costs from additional working hours (overtime) for 4 hours and additional workforce. From the design budget for the mosque construction project at the State University of Malang, it is planned that the tota...
Pembangunan perumahan sangat dipengaruhi oleh berbagai aspek yaitu tingginya laju pertumbuhan pendud...
Project management so important for implementation a project for avoid problem that can create disad...
Dalam menyelesaikan suatu proyek untuk mencapai tujuan dengan efektif dan efisien, diperlukan sistem...
The Al-Hikmah Mosque Development Project, State University of Malang was built on an area of ± 9,000...
The 3rd stage of the Islamic Hospital construction project of UNISMA Malang is built on an area of ±...
Dalam kegiatan konstruksi melibatkan tiga fase yaitu: perencanaan, penentuan jadwal kegiatan konstru...
Penelitian ini bertujuan untuk mengetahui pengaruh metode Fast Track pada pelaksanaan proyek konstru...
This study discusses work performance, differences in costs and delays or the speed of work on the c...
Perkembangan dunia konstruksi di Indonesia semakin berkembang pesat seiring dengan meningkatnya keb...
To obtain a better profit without ignoring work safety and quality of work, the acceleration ofthe i...
Pelaksanaan pekerjaan pada sebagian ruas proyek Jalan Tol Trans Jawa mengalami kendala keterlamabata...
The implementation method in construction projects generally uses an implementation method that can ...
Tujuan penelitian ini adalah untuk mengetahui percepatan waktu dan biaya yang dapat dihemat pada pro...
Project completion delays still occur frequently until now, this is caused by a number of factors su...
In the development of construction activities, losing something that happens very often in the field...
Pembangunan perumahan sangat dipengaruhi oleh berbagai aspek yaitu tingginya laju pertumbuhan pendud...
Project management so important for implementation a project for avoid problem that can create disad...
Dalam menyelesaikan suatu proyek untuk mencapai tujuan dengan efektif dan efisien, diperlukan sistem...
The Al-Hikmah Mosque Development Project, State University of Malang was built on an area of ± 9,000...
The 3rd stage of the Islamic Hospital construction project of UNISMA Malang is built on an area of ±...
Dalam kegiatan konstruksi melibatkan tiga fase yaitu: perencanaan, penentuan jadwal kegiatan konstru...
Penelitian ini bertujuan untuk mengetahui pengaruh metode Fast Track pada pelaksanaan proyek konstru...
This study discusses work performance, differences in costs and delays or the speed of work on the c...
Perkembangan dunia konstruksi di Indonesia semakin berkembang pesat seiring dengan meningkatnya keb...
To obtain a better profit without ignoring work safety and quality of work, the acceleration ofthe i...
Pelaksanaan pekerjaan pada sebagian ruas proyek Jalan Tol Trans Jawa mengalami kendala keterlamabata...
The implementation method in construction projects generally uses an implementation method that can ...
Tujuan penelitian ini adalah untuk mengetahui percepatan waktu dan biaya yang dapat dihemat pada pro...
Project completion delays still occur frequently until now, this is caused by a number of factors su...
In the development of construction activities, losing something that happens very often in the field...
Pembangunan perumahan sangat dipengaruhi oleh berbagai aspek yaitu tingginya laju pertumbuhan pendud...
Project management so important for implementation a project for avoid problem that can create disad...
Dalam menyelesaikan suatu proyek untuk mencapai tujuan dengan efektif dan efisien, diperlukan sistem...