Early in the LHC-project, a decision was made to complete in-house, as much of the engineering for the new cooling and ventilation systems as was practicable. This is achieved using the competence of resident (CERN staff) engineers for the studies, project management, on-site installation, supervision, etc. The documentation has however, been compiled using the format of tender drawings in the technical office by industrial service personnel. This model, adopted by the Cooling and Ventilation (CV) group is attractive from the viewpoint of conservation of “know-how” within CERN. The main difficulty is however, to be able to absorb such an important project within available manpower. This paper will revisit the arguments behind this method as...
This paper/presentation describes the existing LHC ventilation (HVAC) system, the design principle f...
CERN és el Consell Europeu de la Investigació Nuclear. ÉS el laboratori més gran de física de partíc...
In 2001, the project management decided to perform at CERN the final assembly of the LHC superconduc...
A core team of CERN staff is running the daily operations of the cooling and ventilation equipment a...
Built in the beginning of 1970's, the Computer Centre air-conditioning and cooling systems were desi...
The adaptation of the ventilation systems as well as the integration of equipment to fit with the ne...
This report will give an explanation of the internal reorganization that has been done because of th...
The cooling and Ventilation (CV) group has emphasised the need to redefine its organisational struct...
In April 1996 CERN awarded three contracts for the provision of civil engineering design and site su...
During the next three years, the ST/CV group will be deeply involved in the installation works for t...
The Large Hadron Collider (LHC) under construction at the European Laboratory for Particle Physics, ...
Since the beginning of the collaboration between the ST division and the LHC experiments, already in...
This note summarises the development work carried out on the supporting system for the LHC magnets s...
Some of the electronic equipment to be installed in the rack space under the future LHC dipoles and ...
The presentation gives an overview of the major projects and work foreseen to be performed during ne...
This paper/presentation describes the existing LHC ventilation (HVAC) system, the design principle f...
CERN és el Consell Europeu de la Investigació Nuclear. ÉS el laboratori més gran de física de partíc...
In 2001, the project management decided to perform at CERN the final assembly of the LHC superconduc...
A core team of CERN staff is running the daily operations of the cooling and ventilation equipment a...
Built in the beginning of 1970's, the Computer Centre air-conditioning and cooling systems were desi...
The adaptation of the ventilation systems as well as the integration of equipment to fit with the ne...
This report will give an explanation of the internal reorganization that has been done because of th...
The cooling and Ventilation (CV) group has emphasised the need to redefine its organisational struct...
In April 1996 CERN awarded three contracts for the provision of civil engineering design and site su...
During the next three years, the ST/CV group will be deeply involved in the installation works for t...
The Large Hadron Collider (LHC) under construction at the European Laboratory for Particle Physics, ...
Since the beginning of the collaboration between the ST division and the LHC experiments, already in...
This note summarises the development work carried out on the supporting system for the LHC magnets s...
Some of the electronic equipment to be installed in the rack space under the future LHC dipoles and ...
The presentation gives an overview of the major projects and work foreseen to be performed during ne...
This paper/presentation describes the existing LHC ventilation (HVAC) system, the design principle f...
CERN és el Consell Europeu de la Investigació Nuclear. ÉS el laboratori més gran de física de partíc...
In 2001, the project management decided to perform at CERN the final assembly of the LHC superconduc...