The presentation gives an overview of the major projects and work foreseen to be performed during next long shutdown on cooling and ventilation plants. Several projects are needed following the experience of the last years when LHC was running, in particular the modifications in the water cooling circuits presently in overflow. Some other projects are linked to the CV consolidation plan. Finally, most of the work shall be done to respond to additional requests: SR buildings air conditioning, the need to be able to clean and maintain the LHC cooling towers without a complete stop of cooling circuits, the upgrade of the air conditioning of the CCC rack room cooling etc. For all these activities, the author will detail constraints and the impa...
Assuming that Linac4 is connected to the PSB in LS2, we will outline the maintenance and basic conso...
During the LHC operation in 2010 and 2011, the cryogenic system has achieved an availability level f...
The cooling and Ventilation (CV) group has emphasised the need to redefine its organisational struct...
The Cooling and Ventilation (CV) Group in the Engineering Department (EN) will be heavily involved i...
The first shutdown of the LHC machine started on the 17th of November 2008. In addition to typical s...
Many conference series have adopted the same The first shutdown of the LHC machine started on the 17...
The shutdown originally planned for 2011-13 is the first opportunity since physics operation started...
This paper summarises the two sessions, which were devoted to the activities planned for the next lo...
After a very successful first two years of LHC physics operations, LHC computing has entered an asse...
The Large Hadron Collider at CERN entered into its first 18 month-long shutdown period in February 2...
The first part of the collimation upgrade plan features the installation of 4 collimators in the 2 D...
The LHC and its Injectors are submitted to an overall lifecycle of three to four years of physics de...
The first LHC long shutdown (LS1) started in February 2013. It was triggered by the need to consolid...
The first period of LHC cryogenic operation between 2008 and 2013 allowed gaining practical knowledg...
The LHC has just come to the end of its first Long Shutdown (LS1) and preparations are underway to p...
Assuming that Linac4 is connected to the PSB in LS2, we will outline the maintenance and basic conso...
During the LHC operation in 2010 and 2011, the cryogenic system has achieved an availability level f...
The cooling and Ventilation (CV) group has emphasised the need to redefine its organisational struct...
The Cooling and Ventilation (CV) Group in the Engineering Department (EN) will be heavily involved i...
The first shutdown of the LHC machine started on the 17th of November 2008. In addition to typical s...
Many conference series have adopted the same The first shutdown of the LHC machine started on the 17...
The shutdown originally planned for 2011-13 is the first opportunity since physics operation started...
This paper summarises the two sessions, which were devoted to the activities planned for the next lo...
After a very successful first two years of LHC physics operations, LHC computing has entered an asse...
The Large Hadron Collider at CERN entered into its first 18 month-long shutdown period in February 2...
The first part of the collimation upgrade plan features the installation of 4 collimators in the 2 D...
The LHC and its Injectors are submitted to an overall lifecycle of three to four years of physics de...
The first LHC long shutdown (LS1) started in February 2013. It was triggered by the need to consolid...
The first period of LHC cryogenic operation between 2008 and 2013 allowed gaining practical knowledg...
The LHC has just come to the end of its first Long Shutdown (LS1) and preparations are underway to p...
Assuming that Linac4 is connected to the PSB in LS2, we will outline the maintenance and basic conso...
During the LHC operation in 2010 and 2011, the cryogenic system has achieved an availability level f...
The cooling and Ventilation (CV) group has emphasised the need to redefine its organisational struct...