The adaptation of the ventilation systems as well as the integration of equipment to fit with the new LHC ventilation requirements lead us to consider a global re-engineering of the existing control system. This, decade old process control structure is composed of elements which are mixed between industrial and home made devices. The proposed modifications are made in order to upgrade the present control system and to provide efficient and well adapted control architecture to integrate the LHC ventilation equipment of the injection tunnels. Moreover, we need a plan for the next fifteen years of the LHC life cycle. The document is to present the situation of the present control system of the LEP ventilation process and to propose a plan for ...
The cooling and Ventilation (CV) group has emphasised the need to redefine its organisational struct...
For two years (Spring 2013 - Spring 2015), the LHC went through its first long shutdown (LS1). It wa...
In 1990, CERN passed a multi-year purchasing and installation contract for the LEP 200 Cryogenics co...
At the time of the ICALEPCS 2007 conference, the LHC main accelerator will be close to its final sta...
The CERN Large Hadron Collider (LHC) will start to deliver particles to its experiments in the year ...
This paper/presentation describes the existing LHC ventilation (HVAC) system, the design principle f...
After 3 years of operation, the LHC entered its first Long Shutdown period (LS1), in February 2013 [...
Early in the LHC-project, a decision was made to complete in-house, as much of the engineering for t...
The Large Hadron Collider (LHC) operates using superfluid helium provided by eight large refrigerati...
The Large Hadron Collider (LHC) was commissioned at CERN and started operation with beams in 2008. T...
AbstractThe cryogenic control systems at Laboratori Nazionali di Legnaro (LNL) are undergoing an imp...
The Large Hadron Collider (LHC) was commissioned at CERN and started operation with beams in 2008. S...
AbstractThe cryogenic control systems at Laboratori Nazionali di Legnaro (LNL) are undergoing an imp...
The current cavern ventilation control system of the CMS experiment at CERN is based on components w...
Renovation of the control system of the CERN LHC injectors was initiated in 2007 in the scope of the...
The cooling and Ventilation (CV) group has emphasised the need to redefine its organisational struct...
For two years (Spring 2013 - Spring 2015), the LHC went through its first long shutdown (LS1). It wa...
In 1990, CERN passed a multi-year purchasing and installation contract for the LEP 200 Cryogenics co...
At the time of the ICALEPCS 2007 conference, the LHC main accelerator will be close to its final sta...
The CERN Large Hadron Collider (LHC) will start to deliver particles to its experiments in the year ...
This paper/presentation describes the existing LHC ventilation (HVAC) system, the design principle f...
After 3 years of operation, the LHC entered its first Long Shutdown period (LS1), in February 2013 [...
Early in the LHC-project, a decision was made to complete in-house, as much of the engineering for t...
The Large Hadron Collider (LHC) operates using superfluid helium provided by eight large refrigerati...
The Large Hadron Collider (LHC) was commissioned at CERN and started operation with beams in 2008. T...
AbstractThe cryogenic control systems at Laboratori Nazionali di Legnaro (LNL) are undergoing an imp...
The Large Hadron Collider (LHC) was commissioned at CERN and started operation with beams in 2008. S...
AbstractThe cryogenic control systems at Laboratori Nazionali di Legnaro (LNL) are undergoing an imp...
The current cavern ventilation control system of the CMS experiment at CERN is based on components w...
Renovation of the control system of the CERN LHC injectors was initiated in 2007 in the scope of the...
The cooling and Ventilation (CV) group has emphasised the need to redefine its organisational struct...
For two years (Spring 2013 - Spring 2015), the LHC went through its first long shutdown (LS1). It wa...
In 1990, CERN passed a multi-year purchasing and installation contract for the LEP 200 Cryogenics co...