from the District drainage wells and tile drains decrease. Some reduction in drainage pumping below the 300 cfs conveyance channel capacity will be required during the months of May, June, and September in the early years of the Minute. Of course, drainage pumping needed to prevent high groundwater within the project will be given first consideration in the pumping schedule. During the winter months when drainage water is being bypassed and Mexico is scheduling minimum deliveries, quantity will be limited only by the capacity of the drainage channels. Every effort will be made to evacuate as much salt as possible during these periods in order to permit maximum flexibility in the summer pumping schedule. 4. It appears that if the rate of de...