a change in Mexico's cropping pattern. Similarly, as in Alternative No. 1, this is an action that is a prerogative of the Republic of Mexico and therefore beyond the scope of this report. 3. Alternative Plan No. 3 - Regulation of Drainage Pumping. This is the plan (with modifications) recommended in this report. The principal difference between the panel's plan and the plan proposed in this report is that the panel's report contemplates no pumping in Wellton-Mohawk during the winter months. Investigations for this report indicate that if there is no drainage pumping during the winter the saline concentration at Morelos Dam will be significantly increased during the summer months and that ground-water levels could encroach on the root zone ...