This report summarizes the discussion of the meeting for the benefit of those who may want to trace the development of thought on this subject
Memorandum on the Whirlwind II meeting of March 28, 1952 on D. Buck's non-destructive read-out and R...
Present: H. Anderson, J. Crane, R. R. Everett, W. A. Hosier, R. Hughes, K. H. Olsen, R. Pfaff, N. H....
Includes: quarterly review and abstract; mathematics, coding and applications; operation of Whirlwin...
This note abstracts the discussion of the meeting attended by the following persons, for the benefit...
Present: D. Brown, R. Everett, J. Forrester, H. Grosch, W. Hosier, J. Hughes, J. Jacobs, R. Jeffrey,...
Present: J. W. Forrester, C. W. Adams, D. R. Brown, R. R. Everett, D. R. Israel, B. E. Morris, W. N....
Present: J. W. Forrester, C. W. Adams, D. R. Brown, R. R. Everett, D. R. Israel, W. Linvill, B. E. M...
Present: K. H. Olsen, N. H. Taylor, H. Smead, R. R. Everett, R. von Buelow, W. A. Hosier, J. Crane, ...
Present: R. R. Everett, N. H. Taylor, J. A. Arnow, D. R. Brown. W. J. Canty, C. L. Corderman, N. L. ...
Memorandum on estimates regarding time and personnel required for the work leading up to the product...
Central display equipment for production systems will be engineered by Ralph Mork at IBM Vestal. Pla...
Includes: foreword; quarterly review (and abstract); system engineering, reliability and checking, i...
A proposal for change in the plan for actual construction of the prototype models has been made by I...
Includes: foreword; quarterly review (and abstract); system engineering, storage reliability and che...
Operation of the core memory of the WWI--Cape Cod System has resulted in several changes in the elec...
Memorandum on the Whirlwind II meeting of March 28, 1952 on D. Buck's non-destructive read-out and R...
Present: H. Anderson, J. Crane, R. R. Everett, W. A. Hosier, R. Hughes, K. H. Olsen, R. Pfaff, N. H....
Includes: quarterly review and abstract; mathematics, coding and applications; operation of Whirlwin...
This note abstracts the discussion of the meeting attended by the following persons, for the benefit...
Present: D. Brown, R. Everett, J. Forrester, H. Grosch, W. Hosier, J. Hughes, J. Jacobs, R. Jeffrey,...
Present: J. W. Forrester, C. W. Adams, D. R. Brown, R. R. Everett, D. R. Israel, B. E. Morris, W. N....
Present: J. W. Forrester, C. W. Adams, D. R. Brown, R. R. Everett, D. R. Israel, W. Linvill, B. E. M...
Present: K. H. Olsen, N. H. Taylor, H. Smead, R. R. Everett, R. von Buelow, W. A. Hosier, J. Crane, ...
Present: R. R. Everett, N. H. Taylor, J. A. Arnow, D. R. Brown. W. J. Canty, C. L. Corderman, N. L. ...
Memorandum on estimates regarding time and personnel required for the work leading up to the product...
Central display equipment for production systems will be engineered by Ralph Mork at IBM Vestal. Pla...
Includes: foreword; quarterly review (and abstract); system engineering, reliability and checking, i...
A proposal for change in the plan for actual construction of the prototype models has been made by I...
Includes: foreword; quarterly review (and abstract); system engineering, storage reliability and che...
Operation of the core memory of the WWI--Cape Cod System has resulted in several changes in the elec...
Memorandum on the Whirlwind II meeting of March 28, 1952 on D. Buck's non-destructive read-out and R...
Present: H. Anderson, J. Crane, R. R. Everett, W. A. Hosier, R. Hughes, K. H. Olsen, R. Pfaff, N. H....
Includes: quarterly review and abstract; mathematics, coding and applications; operation of Whirlwin...