Operation of the core memory of the WWI--Cape Cod System has resulted in several changes in the electronics to improve operating margins. Decision was reached to base drum circuit design on a maximum memory cycle time of 8 μsec. Additional storage capacity for radar input data has been achieved by reallocation of and use of previously unassigned drum fields. Primary power variations are to be studied. A proposal covering the amount of drum storage for output data, as well as kind and amount of data for each type of weapon has been prepared. A list of equipment for XD-1 and XD-2 systems is being issued
Present: K. H. Olsen, N. H. Taylor, H. Smead, R. R. Everett, R. von Buelow, W. A. Hosier, J. Crane, ...
Present: Jay W. Forrester, D. R. Brown, S. H. Dodd, R. R. Everett, J. C. Proctor, N. H. Taylor, C. R...
Program for development of phone line specifications for reliable data transmission to be carried ou...
A proposal for change in the plan for actual construction of the prototype models has been made by I...
Includes: introduction; equipment and logical functions submitted for acceptance; results of accepta...
Specifications for the display system, the power system and the internal memory will be prepared. Ou...
Two situations urgently need attention at the present time. The vacuum tube count for a central has ...
Includes: physical and logical status of XD-1; reliability; margins and margin history; shock tests;...
To help settle some of the questions raised by the prospect of having a 4096-register magnetic memor...
Principal work during this period has been concerned with the display systems development and reduct...
A conference reached agreement on the display specifications. They are presently being written up fo...
Present: H. Anderson, J. Crane, R. R. Everett, W. A. Hosier, R. Hughes, K. H. Olsen, R. Pfaff, N. H....
Central display equipment for production systems will be engineered by Ralph Mork at IBM Vestal. Pla...
"March 14, 1955."Bibliography: p. 28.Army Signal Corps Contract No. WA36-039 sc-42607. Dept. of the ...
Active consideration is being given to having IBM - Endicott take on the engineering responsibility ...
Present: K. H. Olsen, N. H. Taylor, H. Smead, R. R. Everett, R. von Buelow, W. A. Hosier, J. Crane, ...
Present: Jay W. Forrester, D. R. Brown, S. H. Dodd, R. R. Everett, J. C. Proctor, N. H. Taylor, C. R...
Program for development of phone line specifications for reliable data transmission to be carried ou...
A proposal for change in the plan for actual construction of the prototype models has been made by I...
Includes: introduction; equipment and logical functions submitted for acceptance; results of accepta...
Specifications for the display system, the power system and the internal memory will be prepared. Ou...
Two situations urgently need attention at the present time. The vacuum tube count for a central has ...
Includes: physical and logical status of XD-1; reliability; margins and margin history; shock tests;...
To help settle some of the questions raised by the prospect of having a 4096-register magnetic memor...
Principal work during this period has been concerned with the display systems development and reduct...
A conference reached agreement on the display specifications. They are presently being written up fo...
Present: H. Anderson, J. Crane, R. R. Everett, W. A. Hosier, R. Hughes, K. H. Olsen, R. Pfaff, N. H....
Central display equipment for production systems will be engineered by Ralph Mork at IBM Vestal. Pla...
"March 14, 1955."Bibliography: p. 28.Army Signal Corps Contract No. WA36-039 sc-42607. Dept. of the ...
Active consideration is being given to having IBM - Endicott take on the engineering responsibility ...
Present: K. H. Olsen, N. H. Taylor, H. Smead, R. R. Everett, R. von Buelow, W. A. Hosier, J. Crane, ...
Present: Jay W. Forrester, D. R. Brown, S. H. Dodd, R. R. Everett, J. C. Proctor, N. H. Taylor, C. R...
Program for development of phone line specifications for reliable data transmission to be carried ou...