Present: J. W. Forrester, C. W. Adams, D. R. Brown, R. R. Everett, D. R. Israel, B. E. Morris, W. N. Papian, N. H. Taylor, R. L. WalquistMemorandum on the second of a series of meetings of Digital Computer Laboratory research staff on the development of an Air Defense Computer
A conference reached agreement on the display specifications. They are presently being written up fo...
In the initial month following issuance of letter of intent considerable interchange of engineering ...
Control Systems Laboratory changed its name to Coordinated Science LaboratoryContract DA-11-022-ORD-...
Present: J. W. Forrester, C. W. Adams, D. R. Brown, R. R. Everett, D. R. Israel, W. Linvill, B. E. M...
This note abstracts the discussion of the meeting attended by the following persons, for the benefit...
Present: K. H. Olsen, N. H. Taylor, H. Smead, R. R. Everett, R. von Buelow, W. A. Hosier, J. Crane, ...
Memorandum on estimates regarding time and personnel required for the work leading up to the product...
Present: H. Anderson, J. Crane, R. R. Everett, W. A. Hosier, R. Hughes, K. H. Olsen, R. Pfaff, N. H....
Present: D. Brown, R. Everett, J. Forrester, H. Grosch, W. Hosier, J. Hughes, J. Jacobs, R. Jeffrey,...
Present: J. W. Forrester, C. W. Adams, D. R. Brown, R. R. Everett, D. R. Israel, B. E. Morris, W. N....
Includes time schedule.Revision of a memo originally composed January 27, 1955.The second central co...
This memorandum contains the text of a talk given at the E.E. Department Colloquium, May 3, 1950. Th...
Present: D. R. Brown, J. D. Crane, R. R. Everett, J. W. Forrester, R. G. Farmer, W. A. Hosier, R. Hu...
This report summarizes the discussion of the meeting for the benefit of those who may want to trace ...
The third month of the interval covered by the Subcontract between MIT and IBM has continued discuss...
A conference reached agreement on the display specifications. They are presently being written up fo...
In the initial month following issuance of letter of intent considerable interchange of engineering ...
Control Systems Laboratory changed its name to Coordinated Science LaboratoryContract DA-11-022-ORD-...
Present: J. W. Forrester, C. W. Adams, D. R. Brown, R. R. Everett, D. R. Israel, W. Linvill, B. E. M...
This note abstracts the discussion of the meeting attended by the following persons, for the benefit...
Present: K. H. Olsen, N. H. Taylor, H. Smead, R. R. Everett, R. von Buelow, W. A. Hosier, J. Crane, ...
Memorandum on estimates regarding time and personnel required for the work leading up to the product...
Present: H. Anderson, J. Crane, R. R. Everett, W. A. Hosier, R. Hughes, K. H. Olsen, R. Pfaff, N. H....
Present: D. Brown, R. Everett, J. Forrester, H. Grosch, W. Hosier, J. Hughes, J. Jacobs, R. Jeffrey,...
Present: J. W. Forrester, C. W. Adams, D. R. Brown, R. R. Everett, D. R. Israel, B. E. Morris, W. N....
Includes time schedule.Revision of a memo originally composed January 27, 1955.The second central co...
This memorandum contains the text of a talk given at the E.E. Department Colloquium, May 3, 1950. Th...
Present: D. R. Brown, J. D. Crane, R. R. Everett, J. W. Forrester, R. G. Farmer, W. A. Hosier, R. Hu...
This report summarizes the discussion of the meeting for the benefit of those who may want to trace ...
The third month of the interval covered by the Subcontract between MIT and IBM has continued discuss...
A conference reached agreement on the display specifications. They are presently being written up fo...
In the initial month following issuance of letter of intent considerable interchange of engineering ...
Control Systems Laboratory changed its name to Coordinated Science LaboratoryContract DA-11-022-ORD-...