A bunch length monitor for very short electron bunches, r.m.s. > 1 ps, has been implemented in the CLIC (Compact Linear Collider) Test Facility (CTF) at CERN. It consists of a long, rectangular wavegu ide connected at one end to the beam pipe and a detection system at the other end. Information on the bunch length is obtained by frequency-domain analysis of the signal excited by the beam in the wav eguide. The signal can be detected either by a fast diode detector or by a RF mixer in combination with a RF sweep oscillator. With the diode detector, single-shot measurements can be performed, while the mixer set-up allows quantitative bunch length measurements for single bunches and for bunch-trains. The design and installation of two monitors...
International audienceWe present the observation and the detailed investigation of coherent Cherenko...
The CLIC Test Facility 3 (CTF3) is being built and commissioned by an international collab...
A new electro-optic bunch profile monitor has recently been installed in CLIC Test Facility 3 at CER...
A bunch length monitor for very short electron bunches, r.m.s. > 1 ps, has been implemented in the C...
A non-destructive bunch length detector has been installed in the CLIC Test Facility (CTF3). Using a...
This CSR detector was developed to monitor nondestructively the length of a subpicosecond bunch with...
The CLIC Test Facility 3 (CTF3) is being built and commissioned by an international collaboration to...
In recent years, there has been increasing interest in short electron bunches for different applicat...
In the framework of the CLIC RF power source studies, the feasibility of the electron bunch train co...
The Saskatchewan Accelerator Laboratory is a 300 MeV electron accelerator (Linac) and storage ring. ...
A compact rf cavity was constructed that simultaneously resonates at many harmonic modes when excite...
MOPD26, PosterInternational audienceMeasurements of the bunch longitudinal shape of beamparticles ar...
WEPC20International audienceMeasurements of the bunch longitudinal shape of beam particles are cruci...
The Test Facility of the "Compact Linear Collider" (CLIC) at CERN (CTF), has to prove the feasibilit...
The Compact Linear Collider (CLIC) requires beam position monitors (BPMs) with 50 nm spatial resolut...
International audienceWe present the observation and the detailed investigation of coherent Cherenko...
The CLIC Test Facility 3 (CTF3) is being built and commissioned by an international collab...
A new electro-optic bunch profile monitor has recently been installed in CLIC Test Facility 3 at CER...
A bunch length monitor for very short electron bunches, r.m.s. > 1 ps, has been implemented in the C...
A non-destructive bunch length detector has been installed in the CLIC Test Facility (CTF3). Using a...
This CSR detector was developed to monitor nondestructively the length of a subpicosecond bunch with...
The CLIC Test Facility 3 (CTF3) is being built and commissioned by an international collaboration to...
In recent years, there has been increasing interest in short electron bunches for different applicat...
In the framework of the CLIC RF power source studies, the feasibility of the electron bunch train co...
The Saskatchewan Accelerator Laboratory is a 300 MeV electron accelerator (Linac) and storage ring. ...
A compact rf cavity was constructed that simultaneously resonates at many harmonic modes when excite...
MOPD26, PosterInternational audienceMeasurements of the bunch longitudinal shape of beamparticles ar...
WEPC20International audienceMeasurements of the bunch longitudinal shape of beam particles are cruci...
The Test Facility of the "Compact Linear Collider" (CLIC) at CERN (CTF), has to prove the feasibilit...
The Compact Linear Collider (CLIC) requires beam position monitors (BPMs) with 50 nm spatial resolut...
International audienceWe present the observation and the detailed investigation of coherent Cherenko...
The CLIC Test Facility 3 (CTF3) is being built and commissioned by an international collab...
A new electro-optic bunch profile monitor has recently been installed in CLIC Test Facility 3 at CER...