A new electro-optic bunch profile monitor has recently been installed in CLIC Test Facility 3 at CERN. The monitor is based on an electro-optic spectral decoding scheme which reconstructs the longitudinal profile of the electron bunch by measuring its Coulomb field. The system uses a 780 nm fibre laser system, transported over a 20m long distance to the interaction chamber, where a ZnTe crystal is positioned close to the beam. The assembly also contains a traditional OTR screen, which is coupled to a second optical line and used to adjust the temporal overlap between the laser and the electron pulse. This paper presents the detection system in detail, as well as reporting on the first measurements performed with beam
A bunch length monitor for very short electron bunches, r.m.s. 1 ps, has been implemented in the CL...
At SPARC-LAB, we have installed an Electro-Optic Sampling (EOS) experiment for single shot, non-dest...
In the framework of the CLIC RF power source studies, the feasibility of the electron bunch train co...
A new electro-optic bunch profile monitor has recently been installed in CLIC Test Facility 3 at CER...
Electro-optic (EO) techniques are increasingly used for longitudinal bunch profile measurements. A b...
The innovative CLIC concept is currently under study in the CLIC Test Facility (CTF3) at CERN where ...
The electron gun of the CLIC Test Facility 3 (CTF3) produces 15.6µs long pulses with an energy of 14...
AbstractLongitudinal diagnostics of the electron bunch shapes play a crucial role in the operation o...
A laser wire scanner is under development at CERN in the framework of the Compact LInear Collider st...
An electro-optic longitudinal bunch profile monitor is being implemented on the 4GLS energy recovery...
The measurement of electron bunch temporal profile is one of the key diagnostics in accelerators, es...
The Compact Linear Collider (CLIC) project is a multi-TeV electron-positron collider for particle ph...
A setup for the investigation of Coherent Diffraction Radiation (CDR) from a conducting screen as a ...
The CLIC Test Facility 3 (CTF3) is being built and commissioned by an international collaboration in...
At the KIT electron storage ring KARA (Karlsruhe Research Accellerator) an electro-optical (EO) near...
A bunch length monitor for very short electron bunches, r.m.s. 1 ps, has been implemented in the CL...
At SPARC-LAB, we have installed an Electro-Optic Sampling (EOS) experiment for single shot, non-dest...
In the framework of the CLIC RF power source studies, the feasibility of the electron bunch train co...
A new electro-optic bunch profile monitor has recently been installed in CLIC Test Facility 3 at CER...
Electro-optic (EO) techniques are increasingly used for longitudinal bunch profile measurements. A b...
The innovative CLIC concept is currently under study in the CLIC Test Facility (CTF3) at CERN where ...
The electron gun of the CLIC Test Facility 3 (CTF3) produces 15.6µs long pulses with an energy of 14...
AbstractLongitudinal diagnostics of the electron bunch shapes play a crucial role in the operation o...
A laser wire scanner is under development at CERN in the framework of the Compact LInear Collider st...
An electro-optic longitudinal bunch profile monitor is being implemented on the 4GLS energy recovery...
The measurement of electron bunch temporal profile is one of the key diagnostics in accelerators, es...
The Compact Linear Collider (CLIC) project is a multi-TeV electron-positron collider for particle ph...
A setup for the investigation of Coherent Diffraction Radiation (CDR) from a conducting screen as a ...
The CLIC Test Facility 3 (CTF3) is being built and commissioned by an international collaboration in...
At the KIT electron storage ring KARA (Karlsruhe Research Accellerator) an electro-optical (EO) near...
A bunch length monitor for very short electron bunches, r.m.s. 1 ps, has been implemented in the CL...
At SPARC-LAB, we have installed an Electro-Optic Sampling (EOS) experiment for single shot, non-dest...
In the framework of the CLIC RF power source studies, the feasibility of the electron bunch train co...