[The Team Leader] then proceeded to step over the base stick at the end of the lane into the uncleared area. He has stated he did this in order to investigate the tripwire and identify the location of the PMR2A fragmentation mine. No one witnessed him at this time, and at 09:35hrs an uncontrolled detonation was heard in the location of where [the Victim] had walked
As he was going down the row to mark the end of the row, he stood on two PMA-1 mines on top of each ...
The team started work at 06:00 the victim\u27s partner located a PMA-3 and the Team Leader dealt wi...
At approximately 08:40 hrs whilst Deminer [name excised] was either investigation a previously ident...
There were no witnesses to the actual explosion, however [the Victim] was walking back to the end of...
Approximately 70cm past this 1.2m x 1.2m area was a visual PMR2A. [The Victim] had an indication fro...
At 09h15, the team arrived to Koshare 1. At 11h15, the Team Leader moves [the Victim] to the new wor...
This minefield is PMA 3 Anti Personnel Blast minefield with the mines laid in a very dense pattern. ...
When they moved to the second site, they sent for a local villager to show them where the mines were...
After lunch four of the deminers were tasked to build a bridge over a creek to allow better access t...
The Team Leader started to walk out to the rest area and [the victim] started to mark the cleared ar...
A Team Leader partially detonated a PMA-2 mine whilst deploying his team to their tasks. [Demining g...
The victim insisted that he help the International Supervisor with carrying the sticks into the mine...
The work-site leader, [the Victim], came to deminer [Deminer 1] at 9:20 to measure and record the po...
The team arrived in the area at 10:45. The man supposed to guide them did not arrive, but another pe...
The victim was working in an area of low brush adjacent to a (then) disused farm vehicle track. He w...
As he was going down the row to mark the end of the row, he stood on two PMA-1 mines on top of each ...
The team started work at 06:00 the victim\u27s partner located a PMA-3 and the Team Leader dealt wi...
At approximately 08:40 hrs whilst Deminer [name excised] was either investigation a previously ident...
There were no witnesses to the actual explosion, however [the Victim] was walking back to the end of...
Approximately 70cm past this 1.2m x 1.2m area was a visual PMR2A. [The Victim] had an indication fro...
At 09h15, the team arrived to Koshare 1. At 11h15, the Team Leader moves [the Victim] to the new wor...
This minefield is PMA 3 Anti Personnel Blast minefield with the mines laid in a very dense pattern. ...
When they moved to the second site, they sent for a local villager to show them where the mines were...
After lunch four of the deminers were tasked to build a bridge over a creek to allow better access t...
The Team Leader started to walk out to the rest area and [the victim] started to mark the cleared ar...
A Team Leader partially detonated a PMA-2 mine whilst deploying his team to their tasks. [Demining g...
The victim insisted that he help the International Supervisor with carrying the sticks into the mine...
The work-site leader, [the Victim], came to deminer [Deminer 1] at 9:20 to measure and record the po...
The team arrived in the area at 10:45. The man supposed to guide them did not arrive, but another pe...
The victim was working in an area of low brush adjacent to a (then) disused farm vehicle track. He w...
As he was going down the row to mark the end of the row, he stood on two PMA-1 mines on top of each ...
The team started work at 06:00 the victim\u27s partner located a PMA-3 and the Team Leader dealt wi...
At approximately 08:40 hrs whilst Deminer [name excised] was either investigation a previously ident...