After lunch four of the deminers were tasked to build a bridge over a creek to allow better access to the area being cleared. The remaining deminer and the supervisor cleared a one metre wide lane in order to examine a tripwire that had been spotted outside the working area. When they got close to the tripwire the supervisor took over clearance and worked for 20 minutes. Then he stood up, turned around and requested two more small pickets to mark his lane . While doing this he lost his footing and took a step backwards over his base stick with his right foot, which initiated a mine. This occurred at 13:25
The team were finishing their shift for the day and the victim was asked to mark the edge of the are...
Anxious to speed up progress, the victim decided to carry out a reconnaissance . He checked a detec...
The investigators concluded that the demining group had insufficient lead-time to properly plan th...
The victim was working in an area of low brush adjacent to a (then) disused farm vehicle track. He w...
The accident occurred at the start of the working day when the victim began working in the same lane...
The work-site leader, [the Victim], came to deminer [Deminer 1] at 9:20 to measure and record the po...
From the site examination, the investigators decided that the victim knelt on his base stick and ini...
At 12:40 the two victims were at an appropriate place to site a spur, so the Team Leader instructed ...
The Victim was working in a breaching party making a lane to the top of the hill. He had been workin...
The victim was going to inspect the work of a breaching party when at 09:30 he stepped on a mine tha...
Deminer in the working lane was searching the area using his prodder. When he finalised his search a...
As he was going down the row to mark the end of the row, he stood on two PMA-1 mines on top of each ...
The victim insisted that he help the International Supervisor with carrying the sticks into the mine...
The document stated that the deminers were working on a bare and stony slope. They were familiar wi...
At 09h15, the team arrived to Koshare 1. At 11h15, the Team Leader moves [the Victim] to the new wor...
The team were finishing their shift for the day and the victim was asked to mark the edge of the are...
Anxious to speed up progress, the victim decided to carry out a reconnaissance . He checked a detec...
The investigators concluded that the demining group had insufficient lead-time to properly plan th...
The victim was working in an area of low brush adjacent to a (then) disused farm vehicle track. He w...
The accident occurred at the start of the working day when the victim began working in the same lane...
The work-site leader, [the Victim], came to deminer [Deminer 1] at 9:20 to measure and record the po...
From the site examination, the investigators decided that the victim knelt on his base stick and ini...
At 12:40 the two victims were at an appropriate place to site a spur, so the Team Leader instructed ...
The Victim was working in a breaching party making a lane to the top of the hill. He had been workin...
The victim was going to inspect the work of a breaching party when at 09:30 he stepped on a mine tha...
Deminer in the working lane was searching the area using his prodder. When he finalised his search a...
As he was going down the row to mark the end of the row, he stood on two PMA-1 mines on top of each ...
The victim insisted that he help the International Supervisor with carrying the sticks into the mine...
The document stated that the deminers were working on a bare and stony slope. They were familiar wi...
At 09h15, the team arrived to Koshare 1. At 11h15, the Team Leader moves [the Victim] to the new wor...
The team were finishing their shift for the day and the victim was asked to mark the edge of the are...
Anxious to speed up progress, the victim decided to carry out a reconnaissance . He checked a detec...
The investigators concluded that the demining group had insufficient lead-time to properly plan th...