The team arrived in the area at 10:45. The man supposed to guide them did not arrive, but another person substituted. They drove along an unsurfaced track, then parked and walked on until they could see the remaining minefield marking of a previously cleared area on the other side of the track. They had walked about 15m off the track towards the suspect area before the victim (who was the Team Leader and third in line) stepped on a mine
At 12:40 the two victims were at an appropriate place to site a spur, so the Team Leader instructed ...
On the morning of the accident at approximately 10:15hrs the [Victim] was walking down the track and...
The document stated that the deminers were working on a bare and stony slope. They were familiar wi...
As the Team Leader was looking for any signs of the benchmark or any other marking from the site, he...
The demining group were ready to start work at 08:40 but bad weather prevented work until 11:30 when...
The investigators concluded that the demining group had insufficient lead-time to properly plan th...
After lunch four of the deminers were tasked to build a bridge over a creek to allow better access t...
Prior to the accident the Team Leader had used a machete to clear foliage and to inspect uncleared ...
From the site examination, the investigators decided that the victim knelt on his base stick and ini...
The victim insisted that he help the International Supervisor with carrying the sticks into the mine...
The investigators visited the site on 4th November 1997 and found the deminers clearing a 2m wide ve...
[The Team Leader] then proceeded to step over the base stick at the end of the lane into the unclear...
On 22 December 2010 team arrived to the area on 06:30 and started operation on 07:00 working for 45 ...
As he was going down the row to mark the end of the row, he stood on two PMA-1 mines on top of each ...
A Team Leader partially detonated a PMA-2 mine whilst deploying his team to their tasks. [Demining g...
At 12:40 the two victims were at an appropriate place to site a spur, so the Team Leader instructed ...
On the morning of the accident at approximately 10:15hrs the [Victim] was walking down the track and...
The document stated that the deminers were working on a bare and stony slope. They were familiar wi...
As the Team Leader was looking for any signs of the benchmark or any other marking from the site, he...
The demining group were ready to start work at 08:40 but bad weather prevented work until 11:30 when...
The investigators concluded that the demining group had insufficient lead-time to properly plan th...
After lunch four of the deminers were tasked to build a bridge over a creek to allow better access t...
Prior to the accident the Team Leader had used a machete to clear foliage and to inspect uncleared ...
From the site examination, the investigators decided that the victim knelt on his base stick and ini...
The victim insisted that he help the International Supervisor with carrying the sticks into the mine...
The investigators visited the site on 4th November 1997 and found the deminers clearing a 2m wide ve...
[The Team Leader] then proceeded to step over the base stick at the end of the lane into the unclear...
On 22 December 2010 team arrived to the area on 06:30 and started operation on 07:00 working for 45 ...
As he was going down the row to mark the end of the row, he stood on two PMA-1 mines on top of each ...
A Team Leader partially detonated a PMA-2 mine whilst deploying his team to their tasks. [Demining g...
At 12:40 the two victims were at an appropriate place to site a spur, so the Team Leader instructed ...
On the morning of the accident at approximately 10:15hrs the [Victim] was walking down the track and...
The document stated that the deminers were working on a bare and stony slope. They were familiar wi...