SUBJECT: Request to Withdraw Submittal Pursuant to 10 CFR 2.390(c)(3), GEH desires to withdraw from Commission consideration and obtain return of MFN 06-294, "Information to Support Licensing Topical Report, NEDE-33279P, 'ESBWR Containment Fission Product Removal Evaluation Model" ' (Aug. 23, 2006),. and the proprietary information enclosed therein. As stated in the letter, the information was provided as interim information while the Licensing Topical Report was being finalized. Subsequently, GEH submitted Licensing Topical Reports NEDE-33279P and NEDO-33279 by letter MFN 06-205, Supplement 1
The purpose of this letter is to provide USEC Inc. (USEC) responses to the U.S. Nuclear Regulatory C...
This report includes the issuances received during the specified period from the Commission (CLI), t...
water Reactors, " GE Hitachi Nuclear Energy (GEH) is submitting this report to document any eme...
Subject: Revised Responses to MELLLA+ RAIs (IAC No MB6157) In References 1 and 2, GE responded to NR...
Letter No. 231- Related To ESBWR Design Certification Application- RAI Number 14.3-399 The purpose o...
As indicated in the enclosed materials, this submittal contains information that MHI considers propr...
The purpose of this letter is to request formal NRC staff review and approval to extend the Type A c...
By letter dated May 8, 2001, you submitted for NRC review and approval a request to modify the Hatch...
table in TS 3/4.4.6 and the associated Bases "Reactor from the are also Vessel Material TS. Ref...
Safeguards and the Division of Facilities and Security (NRC) regarding "Applications for a Mate...
The purpose of this letter is to submit the GE Hitachi Nuclear Energy (GEH) response to a portion of...
We have completed our review of the subject topical report dated July 1988 together with responses t...
SUBJECT: WITHDRAWAL OF AD-A995424 FROM DTIC SYSTEM The Defense Nuclear Agency Security Office (ISTS)...
The NRC staff requested that GE-Hitachi Nuclear Energy (GEH) evaluate the potential non-conservatism...
this time to support future requests by the utilities of the B&WOG for elimination of requiremen...
The purpose of this letter is to provide USEC Inc. (USEC) responses to the U.S. Nuclear Regulatory C...
This report includes the issuances received during the specified period from the Commission (CLI), t...
water Reactors, " GE Hitachi Nuclear Energy (GEH) is submitting this report to document any eme...
Subject: Revised Responses to MELLLA+ RAIs (IAC No MB6157) In References 1 and 2, GE responded to NR...
Letter No. 231- Related To ESBWR Design Certification Application- RAI Number 14.3-399 The purpose o...
As indicated in the enclosed materials, this submittal contains information that MHI considers propr...
The purpose of this letter is to request formal NRC staff review and approval to extend the Type A c...
By letter dated May 8, 2001, you submitted for NRC review and approval a request to modify the Hatch...
table in TS 3/4.4.6 and the associated Bases "Reactor from the are also Vessel Material TS. Ref...
Safeguards and the Division of Facilities and Security (NRC) regarding "Applications for a Mate...
The purpose of this letter is to submit the GE Hitachi Nuclear Energy (GEH) response to a portion of...
We have completed our review of the subject topical report dated July 1988 together with responses t...
SUBJECT: WITHDRAWAL OF AD-A995424 FROM DTIC SYSTEM The Defense Nuclear Agency Security Office (ISTS)...
The NRC staff requested that GE-Hitachi Nuclear Energy (GEH) evaluate the potential non-conservatism...
this time to support future requests by the utilities of the B&WOG for elimination of requiremen...
The purpose of this letter is to provide USEC Inc. (USEC) responses to the U.S. Nuclear Regulatory C...
This report includes the issuances received during the specified period from the Commission (CLI), t...
water Reactors, " GE Hitachi Nuclear Energy (GEH) is submitting this report to document any eme...