this time to support future requests by the utilities of the B&WOG for elimination of requirements for a PASS system. Members of the B&WOG intend to utilize this report upon successful completion of the report evaluation by the NRC This document provides a basis for recommending the elimination of all Post Accident Sampling System (PASS) regulatory requirements at operating B&W designed plants. This report concludes that all PASS sample requirements may be eliminated. Flexible requirements may be substituted to (1) determine containment hydrogen concentration, (2) control post-accident reactivity, and (3) maintain RCS coolant at satisfactory pH levels. PASS is not needed to meet these requirements. Elimination of PASS regulatory...
The current wave of small modular reactor (SMR) designs all have the goal of reducing the cost of ma...
At the construction permit (CP) stage of review, ASB reviews the information in the applicant's...
The CSB reviews the analyses of the mass and energy release to assure that the data used to evaluate...
The referenced letter requested an exemption to the requirements for hydrogen control systems in 10 ...
Clearance of radioactively contaminated solid materials by NRC licensees is currently carried out in...
CSB reviews the information presented in the applicant's safety analysis report (SAR) concernin...
staff responsible for the review of applications to construct and operate nuclear power plants inten...
Review of the Three Mile Island accident by NRC has resulted in new post-accident-sampling-capabilit...
The pressure suppression pool is reviewed under this plan only when the applicant claims credit for ...
For Mark I, II, and III- pressure-suppression type boiling water reactor (BWR) plant containments, t...
This document presents the results of studies sponsored by the Nuclear Regulatory Commission (NRC) t...
staff responsible for the review of applications to construct and operate nuclear power plants inten...
The U.S. Nuclear Regulatory Commission's (NRC's) regulations that set standards for protection of th...
The ice condenser system is reviewed to determine the fission product removal effectiveness whenever...
On June 27, 1988, the U.S. Nuclear Regulatory Commission (NRC) published in the Federal Register (53...
The current wave of small modular reactor (SMR) designs all have the goal of reducing the cost of ma...
At the construction permit (CP) stage of review, ASB reviews the information in the applicant's...
The CSB reviews the analyses of the mass and energy release to assure that the data used to evaluate...
The referenced letter requested an exemption to the requirements for hydrogen control systems in 10 ...
Clearance of radioactively contaminated solid materials by NRC licensees is currently carried out in...
CSB reviews the information presented in the applicant's safety analysis report (SAR) concernin...
staff responsible for the review of applications to construct and operate nuclear power plants inten...
Review of the Three Mile Island accident by NRC has resulted in new post-accident-sampling-capabilit...
The pressure suppression pool is reviewed under this plan only when the applicant claims credit for ...
For Mark I, II, and III- pressure-suppression type boiling water reactor (BWR) plant containments, t...
This document presents the results of studies sponsored by the Nuclear Regulatory Commission (NRC) t...
staff responsible for the review of applications to construct and operate nuclear power plants inten...
The U.S. Nuclear Regulatory Commission's (NRC's) regulations that set standards for protection of th...
The ice condenser system is reviewed to determine the fission product removal effectiveness whenever...
On June 27, 1988, the U.S. Nuclear Regulatory Commission (NRC) published in the Federal Register (53...
The current wave of small modular reactor (SMR) designs all have the goal of reducing the cost of ma...
At the construction permit (CP) stage of review, ASB reviews the information in the applicant's...
The CSB reviews the analyses of the mass and energy release to assure that the data used to evaluate...