The KEK/PF 2.5-GeV linac has been upgraded since 1994 by upgrading the existing linac as well as extending it towards the upstream site. It has been almost completed and commissioned during May and June, 1998. This paper summarizes the construction status and the beam performance of the new injector.
The Elettra new full energy injector will be based on a 100 MeV linac pre-injector, a 2.5 GeV booste...
SuperKEKB, which is an upgrade of the KEKB B-factory (KEKB), is a next-generation high-luminosity el...
The KEKB project, which requires an energy upgrade of the KEK linac from 2.5 GeV to 8.0 GeV, started...
The KEKB (B-Factory at KEK) 8-Ge V injector linac is under construction by upgrading the existing 2....
The KEK/PF 2.5-GeV linac is under reconstruction for KEKB (the B-Factory at KEK). The linac will be ...
The KEK/PF 2.5-GeV linac is under reconstruction for KEKB (the B-Factory at KEK). The linac will be ...
The KEK 8-GeV electron linac has been operated for the KEK B-Factory accelerator (KEKB) since Decemb...
The KEKB linac injects 8-GeV electrons and 3.5-GeV positrons into the KEKB asymmetric collider rings...
The KEKB linac injects 8-GeV electrons and 3.5-GeV positrons into the KEKB asymmetric collider rings...
The KEKB linac injects 8-GeV electrons and 3.5-GeV positrons into the KEKB asymmetric collider rings...
KEKB is an electron-positron two-ring collider for the leading B meson factory. It consists of an 8 ...
The KEK Linac provides the four different quality beams for the four independent rings. The KEK Lina...
Abstract Figure 1 shows the layout of KEKB within the KEK site KEKB(B-Factory) is a 3.5 x 8 GeV, two...
After entering into the full-commissioning phase of the KEKB linac in May, 1998, we have established...
(*) Main ring of PF-AR accelerates the beam up to 6.5-GeV. A1 and CT gun are placed most upstream an...
The Elettra new full energy injector will be based on a 100 MeV linac pre-injector, a 2.5 GeV booste...
SuperKEKB, which is an upgrade of the KEKB B-factory (KEKB), is a next-generation high-luminosity el...
The KEKB project, which requires an energy upgrade of the KEK linac from 2.5 GeV to 8.0 GeV, started...
The KEKB (B-Factory at KEK) 8-Ge V injector linac is under construction by upgrading the existing 2....
The KEK/PF 2.5-GeV linac is under reconstruction for KEKB (the B-Factory at KEK). The linac will be ...
The KEK/PF 2.5-GeV linac is under reconstruction for KEKB (the B-Factory at KEK). The linac will be ...
The KEK 8-GeV electron linac has been operated for the KEK B-Factory accelerator (KEKB) since Decemb...
The KEKB linac injects 8-GeV electrons and 3.5-GeV positrons into the KEKB asymmetric collider rings...
The KEKB linac injects 8-GeV electrons and 3.5-GeV positrons into the KEKB asymmetric collider rings...
The KEKB linac injects 8-GeV electrons and 3.5-GeV positrons into the KEKB asymmetric collider rings...
KEKB is an electron-positron two-ring collider for the leading B meson factory. It consists of an 8 ...
The KEK Linac provides the four different quality beams for the four independent rings. The KEK Lina...
Abstract Figure 1 shows the layout of KEKB within the KEK site KEKB(B-Factory) is a 3.5 x 8 GeV, two...
After entering into the full-commissioning phase of the KEKB linac in May, 1998, we have established...
(*) Main ring of PF-AR accelerates the beam up to 6.5-GeV. A1 and CT gun are placed most upstream an...
The Elettra new full energy injector will be based on a 100 MeV linac pre-injector, a 2.5 GeV booste...
SuperKEKB, which is an upgrade of the KEKB B-factory (KEKB), is a next-generation high-luminosity el...
The KEKB project, which requires an energy upgrade of the KEK linac from 2.5 GeV to 8.0 GeV, started...