The KEKB (B-Factory at KEK) 8-Ge V injector linac is under construction by upgrading the existing 2.5-GeV injector as well as extending the linac towards the upstream site. This upgrade has been almost completed and the two linacs are presently being combined. This paper describes the construction status, with emphasis on the newly developed beam monitors being used for various stages of beam commissioning.
KEKB(KEK B-factory) accelerators are under construction and the control computer system for them is ...
After entering into the full-commissioning phase of the KEKB linac in May, 1998, we have established...
SuperKEKB, which is an upgrade of the KEKB B-factory (KEKB), is a next-generation high-luminosity el...
The KEK/PF 2.5-GeV linac has been upgraded since 1994 by upgrading the existing linac as well as ext...
The KEK/PF 2.5-GeV linac is under reconstruction for KEKB (the B-Factory at KEK). The linac will be ...
The KEK/PF 2.5-GeV linac is under reconstruction for KEKB (the B-Factory at KEK). The linac will be ...
The KEKB linac injects 8-GeV electrons and 3.5-GeV positrons into the KEKB asymmetric collider rings...
The KEKB linac injects 8-GeV electrons and 3.5-GeV positrons into the KEKB asymmetric collider rings...
The KEK 8-GeV electron linac has been operated for the KEK B-Factory accelerator (KEKB) since Decemb...
The KEKB linac injects 8-GeV electrons and 3.5-GeV positrons into the KEKB asymmetric collider rings...
KEKB is an electron-positron two-ring collider for the leading B meson factory. It consists of an 8 ...
Abstract Figure 1 shows the layout of KEKB within the KEK site KEKB(B-Factory) is a 3.5 x 8 GeV, two...
The KEK Linac provides the four different quality beams for the four independent rings. The KEK Lina...
The KEK B-Factory, KEKB, is an asymmetric-energy, two-ring, electron-positron collider for B physics...
The KEK B-Factory, KEKB, is an asymmetric-energy, two-ring, electron-positron collider for B physics...
KEKB(KEK B-factory) accelerators are under construction and the control computer system for them is ...
After entering into the full-commissioning phase of the KEKB linac in May, 1998, we have established...
SuperKEKB, which is an upgrade of the KEKB B-factory (KEKB), is a next-generation high-luminosity el...
The KEK/PF 2.5-GeV linac has been upgraded since 1994 by upgrading the existing linac as well as ext...
The KEK/PF 2.5-GeV linac is under reconstruction for KEKB (the B-Factory at KEK). The linac will be ...
The KEK/PF 2.5-GeV linac is under reconstruction for KEKB (the B-Factory at KEK). The linac will be ...
The KEKB linac injects 8-GeV electrons and 3.5-GeV positrons into the KEKB asymmetric collider rings...
The KEKB linac injects 8-GeV electrons and 3.5-GeV positrons into the KEKB asymmetric collider rings...
The KEK 8-GeV electron linac has been operated for the KEK B-Factory accelerator (KEKB) since Decemb...
The KEKB linac injects 8-GeV electrons and 3.5-GeV positrons into the KEKB asymmetric collider rings...
KEKB is an electron-positron two-ring collider for the leading B meson factory. It consists of an 8 ...
Abstract Figure 1 shows the layout of KEKB within the KEK site KEKB(B-Factory) is a 3.5 x 8 GeV, two...
The KEK Linac provides the four different quality beams for the four independent rings. The KEK Lina...
The KEK B-Factory, KEKB, is an asymmetric-energy, two-ring, electron-positron collider for B physics...
The KEK B-Factory, KEKB, is an asymmetric-energy, two-ring, electron-positron collider for B physics...
KEKB(KEK B-factory) accelerators are under construction and the control computer system for them is ...
After entering into the full-commissioning phase of the KEKB linac in May, 1998, we have established...
SuperKEKB, which is an upgrade of the KEKB B-factory (KEKB), is a next-generation high-luminosity el...