The change is a result of the information you provided in response to our 10 CFR 50.54(f) letter of February 23, 1980, reqarding primary coolant system pressure isolation valves. Based upon our review of your response, as well as other previously docketed information, we have concluded that a WASH-1400 Event V valve configuration exists at your facilities and that corrective action as defined in the attached Order is necessary. Attached to the Order for Modification of Licenses is the Technical Evaluation Report (TER) which supports the Order; and the Station Technical Specifications which will ensure public health and safety over the operating life of your facilities. We are aware that there may be edi torial corrections to the attached TE...
Changes to your proposal were necessary to meet our requirements. These have been discussed with and...
changes to the Technical Specifications (TSs) in response to your request dated September 25, 1989, ...
Station. The amendment consists of changes to the Technical Speci fications in response to your appl...
Ladies and Gentlemen: In accordance with the provisions of 10 CFR 50.90, Southern Nuclear Operating ...
The amendments consist of changes to the Technical Specifications (TS) in response to your applicati...
the Oconee Nuclear Station, Units 1, 2, and 3. These amendments are in response to your application ...
DPR-55 for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the...
Station. The amendment consists of changes to the Technical Specifications (Appendix B) in response ...
In accordance with 10 CFR 50.90, "Application for amendment of license or construction permit, ...
an amendment to the above license in the form of changes to the technical specifications. The propos...
In the past, safety and relief valves installed in the primary coolant system of light water reactor...
Third Ten-Year In-Service Inspection interval to perform the system pressure test examination on sel...
for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the Statio...
This amendment revises the Technical Specifications for Seabrook Station, Unit I involving removal o...
response to your application dated June 20, 1995, as supplemented August 30, 1995. This amendment al...
Changes to your proposal were necessary to meet our requirements. These have been discussed with and...
changes to the Technical Specifications (TSs) in response to your request dated September 25, 1989, ...
Station. The amendment consists of changes to the Technical Speci fications in response to your appl...
Ladies and Gentlemen: In accordance with the provisions of 10 CFR 50.90, Southern Nuclear Operating ...
The amendments consist of changes to the Technical Specifications (TS) in response to your applicati...
the Oconee Nuclear Station, Units 1, 2, and 3. These amendments are in response to your application ...
DPR-55 for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the...
Station. The amendment consists of changes to the Technical Specifications (Appendix B) in response ...
In accordance with 10 CFR 50.90, "Application for amendment of license or construction permit, ...
an amendment to the above license in the form of changes to the technical specifications. The propos...
In the past, safety and relief valves installed in the primary coolant system of light water reactor...
Third Ten-Year In-Service Inspection interval to perform the system pressure test examination on sel...
for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the Statio...
This amendment revises the Technical Specifications for Seabrook Station, Unit I involving removal o...
response to your application dated June 20, 1995, as supplemented August 30, 1995. This amendment al...
Changes to your proposal were necessary to meet our requirements. These have been discussed with and...
changes to the Technical Specifications (TSs) in response to your request dated September 25, 1989, ...
Station. The amendment consists of changes to the Technical Speci fications in response to your appl...