requires that the containment equipment door be closed during core alterations or movement of irradiated fuel within containment. TS 3.9.4.b. requires a minimum of one door in each airlock to be closed during core alterations or movement of irradiated fuel within containment. The proposed change to TS 3.9.4.a. would allow the containment equipment door to be open during core alterations and movement of irradiated fuel in containment provided: a) the equipment door is capable of being closed with four bolts within 30 minutes, b) the plant is in MODE 6 with at least 23 feet of water above the reactor pressure vessel flange, and c) a designated crew is available at the equipment door to close the door. The capability to close the containment e...
To request Commission approval to publish a direct final rule and companion proposed rule in the Fed...
amendments are in response to your request dated January 15, 1975. These amendments allow the moment...
The Commission has issued the enclosed Amendment No.132 to Facility Operating License No. DPR-35 for...
containment equipment door be closed during core alterations or movement of irradiated fuel within c...
containment requirements during handling of irradiated fuel and core alterations, " Revision 2,...
DPR-55 for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the...
This letter provides additional information regarding the use of the TMI Unit 1 existing missile shi...
Unit 1 and Unit 2 Technical Specifications (TS) for the Edwin I. Hatch Nuclear Plant. The amendment ...
Station. The amendment consists of changes to the Technical Speci fications in response to your appl...
requests an the changes DESCRIPTION The proposed amendment revises the Unit Nos. 1 and 2 TS Administ...
In accordance with 10 CFR 50.90, "Application for amendment of license or construction permit, ...
amendments are in response to your request dated January IS, 1975. These amendments allow the moment...
an amendment to the above license in the form of changes to the technical specifications. The propos...
Where a door is provided between a dwellinghouse and the garage (see Diagram 5.1), it should meet on...
The amendment modifies Technical Specifications (TSs) to relocate the boration subsystem and Residua...
To request Commission approval to publish a direct final rule and companion proposed rule in the Fed...
amendments are in response to your request dated January 15, 1975. These amendments allow the moment...
The Commission has issued the enclosed Amendment No.132 to Facility Operating License No. DPR-35 for...
containment equipment door be closed during core alterations or movement of irradiated fuel within c...
containment requirements during handling of irradiated fuel and core alterations, " Revision 2,...
DPR-55 for the Oconee Nuclear Station, Units 1, 2, and 3. These amendments consist of changes to the...
This letter provides additional information regarding the use of the TMI Unit 1 existing missile shi...
Unit 1 and Unit 2 Technical Specifications (TS) for the Edwin I. Hatch Nuclear Plant. The amendment ...
Station. The amendment consists of changes to the Technical Speci fications in response to your appl...
requests an the changes DESCRIPTION The proposed amendment revises the Unit Nos. 1 and 2 TS Administ...
In accordance with 10 CFR 50.90, "Application for amendment of license or construction permit, ...
amendments are in response to your request dated January IS, 1975. These amendments allow the moment...
an amendment to the above license in the form of changes to the technical specifications. The propos...
Where a door is provided between a dwellinghouse and the garage (see Diagram 5.1), it should meet on...
The amendment modifies Technical Specifications (TSs) to relocate the boration subsystem and Residua...
To request Commission approval to publish a direct final rule and companion proposed rule in the Fed...
amendments are in response to your request dated January 15, 1975. These amendments allow the moment...
The Commission has issued the enclosed Amendment No.132 to Facility Operating License No. DPR-35 for...