The final LHC dipole series test set-up will consist of 12 benches, organised in 6 clusters of two benches sharing the largest and most expensive devices. This sharing is made possible by a deliberate de-phasing of the tests among magnets, ensuring an optimum use of resources, such as cryogenics and power equipment, without limiting the total throughput. To orchestrate the measurements a Test Master is needed to organise the tests per cluster and a Resource Manager to centralise the booking of the resources.
A test bench has been built at CERN to test and measure the prototype superconducting magnets of the...
Prior to their final preparation before installation in the tunnel, the ~1800 series superconducting...
The LHC construction phase is coming to a close, with installation work progressing rapidly and beam...
The final LHC dipole series test set-up will consist of 12 benches, organised in 6 clusters of two b...
The final LHC dipole series test setup is foreseen as 12 benches where the largest and most expensiv...
The LHC superconducting lattice dipole magnets are presently under construction in three European in...
For the Large Hadron Collider under construction at CERN, an essential requirement is the acceptance...
For the Large Hadron Collider under construction at CERN, an essential requirement is the acceptance...
The Large Hadron Collider operation relies on 1232 superconducting dipoles with a field of 8.33T and...
The result of the magnetic measurements after the cold mass assembly is a holding point for the prod...
Extensive power tests of the LHC dipole magnets required the development of new techniques to study ...
The LHC magnet tests operation team developed various innovative techniques, particularly since earl...
The LHC has 1572 superconducting circuits. Most of the time and resources during the Hardware Commis...
The Large Hadron Collider is now entering in its final phase before receiving beam, and the activiti...
CERN is now setting up String 2 [1], a full-size proto-type of a regular cell of the LHC arc. It is ...
A test bench has been built at CERN to test and measure the prototype superconducting magnets of the...
Prior to their final preparation before installation in the tunnel, the ~1800 series superconducting...
The LHC construction phase is coming to a close, with installation work progressing rapidly and beam...
The final LHC dipole series test set-up will consist of 12 benches, organised in 6 clusters of two b...
The final LHC dipole series test setup is foreseen as 12 benches where the largest and most expensiv...
The LHC superconducting lattice dipole magnets are presently under construction in three European in...
For the Large Hadron Collider under construction at CERN, an essential requirement is the acceptance...
For the Large Hadron Collider under construction at CERN, an essential requirement is the acceptance...
The Large Hadron Collider operation relies on 1232 superconducting dipoles with a field of 8.33T and...
The result of the magnetic measurements after the cold mass assembly is a holding point for the prod...
Extensive power tests of the LHC dipole magnets required the development of new techniques to study ...
The LHC magnet tests operation team developed various innovative techniques, particularly since earl...
The LHC has 1572 superconducting circuits. Most of the time and resources during the Hardware Commis...
The Large Hadron Collider is now entering in its final phase before receiving beam, and the activiti...
CERN is now setting up String 2 [1], a full-size proto-type of a regular cell of the LHC arc. It is ...
A test bench has been built at CERN to test and measure the prototype superconducting magnets of the...
Prior to their final preparation before installation in the tunnel, the ~1800 series superconducting...
The LHC construction phase is coming to a close, with installation work progressing rapidly and beam...