The LHC construction phase is coming to a close, with installation work progressing rapidly and beam start-up foreseen by end 2007. For the testing of the 1706 LHC cryomagnets in cryogenic conditions and its successful completion by early 2007, considerable challenges had to be overcome since 2002 to assure certain semi-routine tests operation at CERN. In particular, the majority of staff for tests and measurement purposes was provided by India on a rotating, one-year-stay basis, as part of the CERN-India Collaboration for LHC. This was complemented by some CERN accelerator Operation staff. While only 95 dipoles were tested till 2003, the efforts and innovative ideas coming from the Operation team contributed significantly to the completion...
Eleven years have passed between the beginning of transport and handling studies in 1996 and the com...
The installation of the LHC (Large Hadron Collider) at CERN is now completed. All magnets are interc...
The final interconnections of the LHC superconducting magnets in the underground tunnel are performe...
The LHC construction phase is coming to a close, with installation work progressing rapidly and beam...
For the Large Hadron Collider under construction at CERN, an essential requirement is the acceptance...
For the Large Hadron Collider under construction at CERN, an essential requirement is the acceptance...
At 10.30 am on 5 September, the 1000th cryo-magnet was installed in the LHC tunnel in the arc betwee...
The LHC magnet tests operation team developed various innovative techniques, particularly since earl...
The LHC is designed to provide proton beams of 7 TeV and nominal luminosity of 10**34 cm**-2s**-1. T...
The Large Hadron Collider (LHC) at CERN is a superconducting accelerator and proton-proton collider ...
CERN's major project, the Large Hadron Collider (LHC), has moved to an implementation phase with mac...
A ceremony was held on Thursday, 1st March, to commemorate the end of the cryostat assembly and cryo...
Eleven years have passed between the beginning of transport and handling studies in 1996 and the com...
The installation of the LHC (Large Hadron Collider) at CERN is now completed. All magnets are interc...
The status of the ongoing LHC installation is reported with some attention given to the long straigh...
Eleven years have passed between the beginning of transport and handling studies in 1996 and the com...
The installation of the LHC (Large Hadron Collider) at CERN is now completed. All magnets are interc...
The final interconnections of the LHC superconducting magnets in the underground tunnel are performe...
The LHC construction phase is coming to a close, with installation work progressing rapidly and beam...
For the Large Hadron Collider under construction at CERN, an essential requirement is the acceptance...
For the Large Hadron Collider under construction at CERN, an essential requirement is the acceptance...
At 10.30 am on 5 September, the 1000th cryo-magnet was installed in the LHC tunnel in the arc betwee...
The LHC magnet tests operation team developed various innovative techniques, particularly since earl...
The LHC is designed to provide proton beams of 7 TeV and nominal luminosity of 10**34 cm**-2s**-1. T...
The Large Hadron Collider (LHC) at CERN is a superconducting accelerator and proton-proton collider ...
CERN's major project, the Large Hadron Collider (LHC), has moved to an implementation phase with mac...
A ceremony was held on Thursday, 1st March, to commemorate the end of the cryostat assembly and cryo...
Eleven years have passed between the beginning of transport and handling studies in 1996 and the com...
The installation of the LHC (Large Hadron Collider) at CERN is now completed. All magnets are interc...
The status of the ongoing LHC installation is reported with some attention given to the long straigh...
Eleven years have passed between the beginning of transport and handling studies in 1996 and the com...
The installation of the LHC (Large Hadron Collider) at CERN is now completed. All magnets are interc...
The final interconnections of the LHC superconducting magnets in the underground tunnel are performe...